1. pre-design - 2 main Chaigai - 3. water reform - 4. woodworking - 5. tiling - 6. whitewash finish - 7. kitchen ceiling - 8. cabinet installation - 9. wooden doors installed - 10. flooring installation - 11 Stones Wallpaper - 12 radiator mounting - 13 switch socket - 14. lighting installation - 15 metal ware installed - - 16. curtain rod installation - 17 pioneering cleaning - 18. Furniture approach - 19. appliance installation - 20.
home decoration accessories, are generally done in accordance with these 20 steps. Here, dead against the best of the best of my, my present understanding of the process of renovation and the entire process needs to pay attention to many details as depicted in detail again ... ...
a decoration part of the whole explanatory process 20
(a) initial design
same construction, and the difference lies in the bees, the bees establish is a reflection of instinct, and in construction before the mind to form fancies and structure premier. So, whether the metaphor of a home-improvement campaign, the elaboration of the pre-design is the battle of the So anew, dead against the chapter above
in the initial design, students must also do one object, it is their room for a detailed measurement, we do not make the inactive, the best measure yourself again, measuring the contents include:
1, explicit the area comprised in the renovation process. Especially the tiling area, an area of wall paint, wallpaper, area, floor area;
2, apparently the main wall size. After the need to design, especially furniture, wall size exhibit.
I remember my family in agreement with the foreman told me the last Re-measurement, the foreman turned around reprimand bricklayer, said: Fitting with the fact in many places, like - we do not know the mouth, but the center must be the number.
take the opportunity to remind everybody, do not forget to start before the start programs for the property, pay the deposit decoration.
(b) of the main Chaigai
into the construction period, the main Chaigai is the first on a project, including cutting down walls, drywall, plaster spatula, split heating, for plastic-steel windows and so on. Main Chaigai plainly, is the first site to come from the first skeleton.
(c) the transformation of water reform
water circuit before the main structure Chaigai should be basically completed. Chaigai in water reform and the main link between the two, some students may know, the cabinet should also be the first measurement. In fact, the first measurement of the so-called cabinet and no real content, because the walls and floor are not dealt with, cabinet designer can not give a characteristic design size, but only on the developer set aside on the outlet, the location of the hood outlet make some recommendations. Include:
1, take a see at the hood outlet location would not affect the subsequent installation of the hood;
2, take a look at the suitability of the location of water meters;
3, to look whether the location on the outlet to facilitate later Install the sink.
closet as the first calculation, there is mini experience of the students can complete on their own. After the transformation was complete, water is best emulated by the restroom water to do. Kitchen usually do not need to do water.
some students have always thought that before the start of upkeep, some of the factor should be agreed in advance. I am mentioning is, unless it is the chief factor accustom Chaigai absence, otherwise, such for ceramic tile, Daixinban additional element of the reach ought be in water reform afterward time. Because the circle is modified if it involves the ground slot, then tile,
GHD IV Styling Set, Daixinban laying rank properly, operators shook around very perplexing. Two days before the
(d)
carpentry carpentry, bricklaying, construction of the oil workers are part of the Basic principle is played - who dirty on who should. In fact, as the archive
riser, ceiling decoration, gypsum paste lines like carpentry sense can be used as a small part of the main Chaigai considered itself not in conflict transformation and water circuits, sometimes also need some cooperation, such as mentioned in my last post - the br> (V) tiling
If personnel are too busy to open the case, the general foreman in the itself is no conflict.
In Window-stone floor tile installation can be done with, you can also after the floor tile, marble window sill of the window cover is generally good after installation, the installation of marble workers will be ready glass, plastic, marble and lightly put the sealed plastic glass window cover the.
2, floor drain installation. Floor drain is a home improvement hardware in the first appearance, as it should and the floor tiles attach with the installation. Therefore, the students start visiting the mansion substances, it should catch the early child purchase floor drain.
3, hood installation. Hood is the first appearance of appliances, kitchen tiles laid out, you can consider installing a hood.
(f) house painter paint
Prepare students wallpaper, just to make As to whether to stay again finish final, private feel this child is not required too seriously, from my experience renovated, leaving again the significance of achieve is not large, because the painting behind the action of no more than a nasty again .
jot to you, death expiration against the kid, chatting with you two. When the The reason why we have this feeling because of the widespread understanding of the decoration is only fitting the
If the . Children nectar water and persist ... ...
(g) kitchen cabinet ceiling
installed as part of the pate of the ceiling, or in the continuation of the family's While in the kitchen ceiling, kitchen humidity Ceiling fan (Yuba) should have been bought. Students best to kitchen ceiling, fan (Yuba) to put in a good, or head and outlet openings remain.
take the chance to insert one, I strongly advocate, , wallpaper paste how to how professional, how to build cabinets how practical ... In my opinion, fitting team can do is carpentry, tiling, painting
Because I believe that the construction vocational, I believe the manufacturers installation class, I believe that the product pipeline operations, mostly handbook workers than the slightly better team decoration. Decorated like the game, gambling is the workers' skills, so wager on The reason why so many students
decoration corporation, decoration team take a lot of construction missions, the reason one hand, their time was not good,
New GHD Professional Pink Straighteners, because there is a consideration, I had determined to outsource water reform, and neighbors to caution me: link up a lot of trouble later.
In truth, every facet of the decoration of independence are mighty, well south of the forum at one time I remember the students answered said that he decorated his home there, every facet of your dedicated workers are the landlords do. So something on home decoration, its actually no convergence at always, but prefer the students themselves in the home improvement process should maximize the so-called the relationship among the workers and so on, this is the opener.
really want to say because the tube
decoration, quality is always ranked first, is the main contradiction is the principle. Some areas for of Students in secondary contradictions as prepared in the main contradiction in principle to make compromises in the meantime, need to be careful.
(h) after the end of kitchen cabinets installed
ceiling, about the cabinet door can be installed. Hopefully, an day to complete. Be installed along the sink (may not contain the upper and lower parts of water) and gas furnace, cabinets before installing the best coordination of the attribute to pass gas, because gas stove gas test is necessitated after installed.
the access, just said ceiling, there is a problem worthy of our learn, numerous students choose waterproof gypsum board dome pantry with waterproof draw, decoration crew quote for extra than $ 120 per square measure, than Lvkou Ban, PVC pinch ceiling to be valuable. Gypsum board ceiling looks visually smooth, but after the altitude surface of water if there are problems, or downstairs with the upstairs leak needs fix, the whole gypsum board ceiling ambition be removed much more trouble than the wall plate ceiling. Therefore, we elect the plasterboard ceiling in the time need to be alert.
(i) installed in the cabinet doors installed
the next day, early in the month before the doors of the measurement is complete, now about installed. Well, then, is one day, put the door at the same time to install the hinge, door locks, to preoccupy. Students should be prepared in advance the pertinent hardware.
If you ambition the gates of the factory-installed window cover, Pass, then manufacturers of wooden doors, meter the time should be measured, and the day of installation to install the doors, catching into account the relentless window sill installatiin season behind erroneous came in the window cover after installation.
Note: wooden doors of the creation wheel, generally one month, so in mandate for the duration of convergence near to the main doors as early as possible after the completion of Chaigai door manufacturers to measure the size of beginnings. On the openings of the processing, we need to note that if the altitude of difference home openings, workers need to be processed into tall - good-looking.
(X) in the wooden floor installed
installed the next day to install the floor, and goes, but also the time of day. Floor installation requires attention to the following questions:
1, before installing the floor, the best site survey so that manufacturers need to look at the ground leveling or partial leveling, some renovation or refurbishment of the company team will warn students on the ground leveling or partial leveling to flooring manufacturers subject to the tangible examine;
2, the ground prior apt installation, home to the floor floor pavement washed, to assure that the ground to dry, so do no water the cleaning process.
3, floor installation, capable to do so, be sure to hack the floor in the corridor. On this issue before the forum also argued, and some students muse that cutting the floor in the corridor and pollution in public areas and immoral. My idea is, after completion of sweep, it does not matter. In the cutting room floor to the walls of the pollution is serious, there is a alike man-made stone cabinet cutting table, I deem the number of students have renewed the experience.
(k) the floor tiling wallpaper
installed the next day, the family clean up, and you can almost paper Stones,
GHD Black Styler Straighteners, and goes well, the same day. Able to do so, paving the wallpaper of the day, the floor should do something to defend; conditions did not matter to clean wallpaper paste left on the floor cleaning is no problem to the Wild. Paving wallpaper before the walls to try to make
(l) heat sink
wallpaper paved in the next day, replace the radiator or radiator Chaigai students can hang down the wall of the radiator. Same day.
doors - floor - Wallpaper - radiator, which is a universally acknowledged appropriate installation sequence, first floor loading door is to ensure that the baseboard and doors can close the door pockets bonding; after wallpaper installed effectively because the installation of the floor more dirty, more dust, pollution of the wallpaper. Used again here in front of me said, Finally, because only the wall mounted radiator is laid out to install the radiator wallpaper.
consecutive fitting process is gradually creature limited with the various constraints beneath conditions designed. Occasionally there are exceptions, such as the need to install the floor Holtz door after door installation, but such exceptions are rare in the renovation process.
In counting, in front of me repeatedly that They also try not to time in the daytime meantime 2 appointments to install, principally for those said on, To learn to solace themselves - we are not bad that daytime.
(m) anti-death switch socket
with only a reminder: students should be home between the switches and sockets in all natural number, location and other issues or have a detailed understanding of the log, especially for the wallpaper students, workers sometimes irresponsible wallpaper, wallpaper covered hula to a sudden, he would not have a wallpaper sword in your opening marked the location of switches and sockets. Therefore, students still need their own beautiful well.
(n)
mounted light fixture installation, nothing to say. Bahrain lights, the kin lit up, command farewell to the decoration 100-watt incandescent lamp glare - feeling good.
(xv) metal ware before installing
bought the chips up and down pipes, bathroom accessories, toilet, drying racks, etc., be installed on both. In front of those Is no amplification to say that the first time you open the water saw the water dragon, gave it a agreeable appoint -
(XVI)
curtain rod curtain rod installation installation marks the end of the basic home improvement.
(xvii) the Wild Wild
cleaning before the cleaning, not curtains, remember, Pioneering cleaning, the family do not have furniture and appliances are not essential to keep more of the
(r) approach
furniture buy furniture on time, my proposal is that the premier completion of the transformation in the water circuit,
GHD IV Mini Straighteners, so select the basic size scope of furniture was generally a number of our hearts. Therefore, some students before the start of the renovation has not been eager to set up furniture, personal feel no need.
(XIX)
device approach to this time, the approach of the appliance approach, the installation of the installation, ready to reside up!
(xx)
home accessories, home accessories, home improvement the last step, and has been decorated by the fitting to include the installation of curtain are all part of home accessories. As for buying curtains, preferably in a good set of furniture, the style in order to avoid conflict. Home accessories can also consider buying some plants, wall art, decorative crafts and so on and so on ... ... In short, stay, you can freely melodrama.
Second, the renovation process of the two divided
read the first partition of the students may feel a little chaotic, in order to assist beyond understanding of all the 20 steps, and some need to disburse attention during the entrainment part, the anti-death in front of that 20 main Chaigai - 5 door manufacturers door measuring --6 cabinet for the first time measurement - 7 water reform - 8 toilet water - 9 Ingredients approach - 10 Woodworking --11 tiling (installed bay windows, floor drain) - 12 Install hood --13 cabinet second measurement --14 whitewash finish - 15 kitchen ceiling --16 pass gas --17 cabinet installation (to install the sink, gas stove) - 18 doors Installation --19 flooring installation - 20 Stones Wallpaper --21 radiator installation --22 switch socket --23 lighting installation - 24 metal ware installed - 25 curtain rod installation --26 pioneering cleaning --27 Furniture approach --28 appliances installed --29 home accessories --30 move
(a) the whole process of fitting the four-step classification
broad-brush, said, according to the txt of the links mentioned at the opening of the 20 division, renovation of the whole process can be divided into the following four areas:
1, the design aspects; (1)
2, construction sectors; (2-6)
3, install the part; (7-16)
4,
GHD Pink Limited Edition, ending part. (17-20)
(b) fitting into the whole process of six steps in accordance with the engineering specifics
, according to the 30 districts just mentioned into the decoration of the whole process can be divided into the following six steps:
The first step: design ideas; (3)
Step two: the main Chaigai; (4)
third step: secluded project; (7)
Fourth step: covering engineering; (10, 11 , 14,15,19,20)
Step five: Install the stage; (17,18,21,22,23,24,25)
Step Six: ending phase. (26,27,28,29,30)
specify:
1, to discriminate it from the bees, we must first have design ideas;
2,
GHD Purple Gift Set, the main Chaigai is to completely change the coarse housing into the site. Chaigai including the main contents of the above just said - therapeutic surgery. Covert projects to do first, that is, we constantly say Wood window cover, Pass, bricklaying tiling, window-stone, window installation, oil painting go - wood, tile, oil is the root of these three projects, the back wall panel ceiling, floor coverings, wallpaper after , even wear clothing over;
5, installation phase, the main function of the comprehension of the completion. Including: cabinets, doors, radiators, switches, sockets, lighting installation, hardware, sanitary ware, curtain rod ... ... Each item has its own set of functions;
6, the ultimate stages, plainly, is to not constitute
by Section II,
decoration to know things (keep back)
experience, so you shirk detours.
1. the bed is too soft
2. If cooking at home will be high frequency words, try to give up the open kitchen, there will be cooking fumes
3. bathroom, Kitchen small water treasure, hot water faster, more handy to use
4. Chinese than European-style hood suction stronger
5. outlet can install as much more decorated, Otherwise, shuffle lines are everywhere at home panel
6. toilet outlet side must be set aside, or washlet not install
7. PK bath shower, a second plebiscite, then it is recommended that shower, bathtub installed, I have never had foam bath is not a minority. Shower not mean shower room, shower chamber glass obliterate up alternatively weary, you can also prefer the basis shower curtain hanging
8. If there are two bathrooms, installed a bathtub or necessary, large bubbles clothing, to aid the newborn bath is a good choice, you do not have a jacuzzi, bubble not several times, but also particularly expensive
9. If not, the people are not cooking, the kitchen is best to install air conditioning
10. If you like the Internet, each side wall of each room are kept for at fewest two Ethernet ports and two or more sockets. Wireless router can absolutely solve the problem, but said sometimes still erratic
11. regret kitchen flue is not playing out immediately at the peak of the building was cooking, own off range hood machines must be open simultaneously, or a room full of cigarette savor
12. room location of all outlets, and then buy the furniture size prejudiced, wasted a lot of outlet
13. If Why buy at the market are, just do not cry carpenter to do! ! ! ! ! Unless the woodworking art very good
14. Floor slightly lighter color, not easy to see ash, but slightly dingy kitchen tiles is not easy to detect cilia everywhere, so that only the most filth
15. the best canteen installing a ceiling fan, super snug
;
16. Reserve things a little more space as possible, after the arrival of the debris will need to merge pile up
17. balcony wall tiles better than the more waterproof wrapping
18. regret buying had installed so many lights, in fact, nailed with a few on that. . .
19. toilet grooming table is glass, and super easy to dirty
20. bedside neglected to install switch, corner off the lights every time out of bed in winter, quite sad
21. bathroom hardware, faucets and the like is definitely a sub-price goods
22. decoration, try not to leave areas that are not clean, corners very complicated to agree in health
23. in the hereafter propose to families with children, must be thought a good size, in the bed next to the crib to be put alongside to the position of
24. recommended that all installed hot and cold water faucets, renovation equipment that can not cost a lot more money later to cure the super-difficult
25. the room is not practical as little as feasible the layout of the RMB glue attitudes do not tear down obsolete sooner or afterward!
26 . buy anything inside the door when the size of attention at home, do not move bought into
27. lumber flooring foot sensibility good but needs livelihood, laminate flooring clean up cozy
28. hidden doors is impractical, to have trouble driving a breathable
29. walk-in wardrobe pleasing, but relatively easy to fouling, open-style shelves, racks, etc. (not the variety of door ), good-looking is good looking, but good pain ah rub together, especially in the book, a layer of ash
30. lights must not be rushed, and that the hang of it after waiting for fouling
dozens of classic decoration effects Recommended!
design theme to the brandy culture, the main reference point font should be
each cube geometry of the whole conception of reference point color
kitchen, powder wall reference point color modeling
video wall video background modeling
reference point reference point movie backdrop video wall fashion and color
video wall reference point and the overall shape of the room with furniture, kitchen ceiling and walls
reference dispose
Reference video wall and the ceiling of the link, the overall glass curtain texture texture
classic sofa corner of the kitchen background
Note
reference edge of the overall layout of the reference point
overall layout
Television wall reference point video background modeling and color
video wall reference point video background modeling and color