,
doudoune moncler
| Back to logs list
326955 2010 年 10 月 25 日 15:54 Reading (loading. ..) Comments (0) Category: Personal Diary
a. Indoor
1 for 10 m below the display. Requirements is a real wall or wall hanging at a concrete beam. Hollow brick or separated files are not this simple installation method
2. for 10 square meters of display,
doudoune femme moncler, and easy maintenance. Wall-mounted with other specific requirements,
moncler doudoune vente, like
3. for and 10 m below the display,
moncler online, the installation must be suitable for installation in locations such as over the top of a beam or girder. And the screen body generally require additional cover.
4. Block loading can be divided into:
movable seat Set: refers to the seat frame separate processing. Placed on the ground,
doudoune moncler homme, can be moved.
Fixed Wing Chong: refers to the seat frame is connected with the ground or fixed wall mounts.