Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Post Your Free Ads Here in English for Advertising .Adult and gambling websites NOT accepted. > Business to Business Ads:

Business to Business Ads: This forum is for posting ads that would be of interest to other Business Owners. Things like Marketing Services, Supply Services, and Business Essentials.

Reply
 
Thread Tools Display Modes
Old 08-20-2011, 12:48 AM   #1
tbmj9153a
 
Posts: n/a
Default 200 elaboration tips (we all see by , quite servic

1, the partition will not be the first shoe, leaving a little space so that shoes can leak into the bottom ash, sink and gas stove top mounted light. Given the location of the bathroom floor drain must first think well, a good amount of size. Drain the best side in the brick, the brick in the middle position if so, how to slope either brick, floor drain is not the lowest point.

2, bathroom, air-conditioning outlets were not designed to switch. Especially the bathroom water heater, a couple of level switch with a plug appropriate. To get cracking electric, pull the plug precarious

3, sun angle on tile portion of the management, in the last thinking is to look at workman level. If the level of good workers, plasterers, tile tools and wear better, they ought not hesitate to choose the train of grinding 45-degree angle. In effect, at all times a good grinding, grinding 45-degree reach angle of the sun angle is the maximum beautiful! If the level is indeed not very good worker, then you still choose to use positive angle of it, because the mill's bad train not as good as 45-degree angle with the angle of the sun's effects.

4, line up the pipes after the water pressure test is also very important. Test, we must all be present, and the test for at least 30 minutes, conditions permitting, the best one hour. 10 kg pressure, without any rebate before the final test.

5, when the steel doors steel doors must be considered a good size border protruding walls to inform the installer, making the final frame and had achieved the wall tiles are smooth, so not only beautiful, and good health to do.

6, carpenter and mason's Door package is to tie the tiling, including door pocket of time to consider the retinue ground (the ground side of the door both side) is also tiled cement mortar or other thing, because if you paste porcelain Door Nail good before, has packages to the ground, with cement in the future, if cement and Door stained, moldy water will cause wood Door

7, under the mattress and bed board must be breathable. Bed board is generally best to use cedar board

8, do the paint as much as periodical tape

9, buy a lamp to note: generally try to use glass, stainless steel, copper or wood (shelf), and generally do not buy any other coating steel plated, ah, ah what kind of paint, easily fade.

10, as usual ceramic basin basin, glass basin downright Health

11, water reform plan to be their own good, inquire them to open the straight-line Cao. Watching them draw their own line, the whole line open by painting Cao. Each have their own acceptance Caixing.

12, water must be good, be sure to test the water!

13, a lot of construction in the verbal accord into the gap checkout slaughtered, must be written in black and white, increase or decrease in prices of items are sure to ask, write it!

14, ground floor, if installed, to re-do all the ground re-smooth cement floor.

15, the kitchen door, or the decoration of wood to make wooden hanging rail doors for good.

16, the living room as much as possible to install the power plug.

17, is still to be done outside the shower toilet sections. Not trouble the easy access to pluck a shower shutter, the actual inconvenience, water everywhere.

18, do door and door frame of the wood material to choose carefully the material.

19, ahead installing the cabinet must be sure your home's water is OKAY.

20, kitchen floor tiles will not elect white.


21, paying particular attention to the ceiling flat putty before wiping Dulux

22, the number of living room lighting should not be too light, simple is better, or like the lighting shop!

23, to buy the things you need to install those dealers will be required to install, it does not include installation, after installation, it must adhere completely to pay money! !

24, decoration, your previously collected business cards manufacturers carry

25, Lvkou Ban protective movie is best removed before installation.

26, the shoe is best to use curtain, anti-odor. You can leave a shoe outlet side, to plug roast shoes.

27, where the cooking can be a small security lights.

28, it is convenient cafeteria exhaust flare can also be safe, so when you eat hot pot or do not dirty barbecue house hall ceiling.

29, the door is best placed to arrange a debris of the cabinet, can be placed on the shoe. The mutual things, such as umbrellas, bags, scissors, coins, and so dine of the narcotics in there, so it is handy.
30, there is no need to use your ceiling, as not too worried about humidity and cooking fumes, moisture-proof gypsum scrubbing brush is recommended to use waterproof paint, a traveler guard my house to do so, very beautiful. If you must use Lvkou Ban ceiling, it is recommended:
1, not too expensive.
2, using the net color, especially the kitchen ceiling, white on the good, and white unless color and decoration style of match, it will easily incongruous.
3, his grasping idea, do not believe selling the vision of smallpox, their eyes Barbara soil.
4, staring at himself in the scene, while income is important, do not let them lax, or leave the black seam, how to look how ugly.

31, third day of the main hole and continue to paste tiles, range hood and vent water heaters to pre-lay, and if so then perforated tiles affixed good, is not convenient. Therefore, the decoration must be elected before the hood, stoves and water heaters, etc., to determine the hole size.

32, although taking into account the custom-made cabinets look good, but not durable, comprehensive online views and experiences of some students, the use of cement to do to counter the framework of internal and outer sides of paste porcelain, marble countertops, wall cabinets and counters wood door or chosen to do. Out of the cabinet to do so durable, moisture-proof. And the cost is small. Many neighbors said looked good, I did not thump.

33, well after the Door, plasterers plaster line to start the installation, wall Pihui project. My family had relatively smooth wall, ratified 2-3 road on it. Pihui allowed when a gray lustered once, and then paint brush after brushing but also polished, and finally twice with ICI paint brush, the whole wall look smooth and flat, really good. Upon completion of the ceiling wall, carpenter started wardrobe. The wardrobe is 18cm Albert card Daixinban do outside paste veneer, nevertheless there is no furniture store to buy so good-looking, but durable, quality should be better than buying. I am not afraid of standing container board. Buy probably will not work. Backplane is relatively thick, thin to buy that.

34, when other students in the tiling must note the following:
① best he can in the field.
② some of the less perfect tile can be attached to the future of some workers to see the location, such as cabinets, sinks, mirrors back, but also pay attention to tile, brick, etc. Do not waist was attached to the above position of workers, or What you can not see the future, but also wasting money.
③ wall tiles, floor tiles in the paste before the overrun damage must be enough time.
④ Be sure to drain plug with something good out of cement down to prevent clogging. My family out because the cement floor drain is blocked, it took 30 management office to find clear, get up a lot of small muck.
⑤ at the scene, the workers will not be too wasted tiles. Tiling my family when not at the scene, then go, wasted a lot of brick, very sad, all sweat Mimi Yeah.

35, a wall of long, high. Such as a bathroom with four walls, each wall should measure out its long, high. And then deduct a window and door area. Finally, count the ground area. After you put a good amount of size, you can also get to sell tile sub shop, they will help you re-match. Plus 5 percent-losses on the line.

36, the best is a two bedroom roof light control, and a door, a bed, a bed of winter save up and then rotate off the lights.

37, the socket must be considered a good location, height, interval. Even first play location having steel cassette, put away after a cassette is found just by TV cabinets, microwave, desk block, the first two had to move the location of furniture, high, and eventually found not only ergonomic elevation, but can not be bought a good fit stainless steel cabinet legs, only customized aluminum feet.

38, just approximately the turn in the hallway favor the one installed, that there are sunny achieve.

39, when mounted lights did not consider the placement of the table, the table now is not in the medium of light.

40, bathroom tiles do not use too much pigment, one easily dirty, and secondly, a long time too dim!


41, outlet to more equipment, furniture to buy outside the ground to be thought secure to dirt, variety of room to look, in rule, to cling to.

42, Lvkou Ban did not need to buy high-priced, very low Lvkou Ban the effect has been far better than PVC, the more money I can not look significantly another results. Buy Lvkouban particular attention to the keel and not Lvkou itself (Lvkou goal is not cozy to tamper too many), commonly on the keel complete ghost.

43, brick color is laborious to find satisfactory, I did not find, but the two kinds of color are not satisfied with staggered mosaic sub 45-degree angle I was skillful to achieve satisfactory results. This is indeed the bricklayer himself put forward good suggestions.

44, playing in the balcony on the top cabinet on the back of the cabinet, then a layer of bubble board insulation with water works well. Balcony door is best to use the same type of fire board. Balcony environment is bad.

45, if no suitable molding may wish to order, custom-made quality also seems better than the sample. More personalized and customized.

46, bathroom floor cabinets with stainless steel thighs are mammoth profits, the back of the cache to find some place to buy cheap price crazy.

47, install the door latch head to disburse attention to some wax, wax on and then breaking also late. If you do not smoke, then likewise disburse attention to the gate deal to discourage wall break.

48, Paco floor well, I like only to remind the landlord to speak directly to the price and the seller to talk about than the price better.

49, matte paint is high and the light pretty

50, if the re-decoration will use putty instead of talc products.

51, installation and atmosphere leakage protection switch coalition box of the project can not be provincial, but not on the outside to be on the interior, the original will want to save wages outside the old coalition box used, electrical suggestion put In the indoor ones, and now he found this suggestion very expensive.

52, and air leakage protection switch to use the brand name. I use the Want to buy the real thing is simple, direct phone check MGE headquarters phone number, and then played to ask the local branch number.

53, Under Counter Basin Above Counter Basin than delicate, nice, good clean. Basin faucet with the audience to pay attention to, taking into account the thickness of the basin edge, leading to the mouth longer.

54, without anybody revision of the wall angle is also very beautiful, but to find a painter in the advance stage and the painter clearly put forward. Ding Jiaoxian angle helps to activity a straight line.

55, online slots before the cement surface of the putty surface treatment is important, for no solid surface with a clean ball handling is very appropriate.

56, make plaster suitable for a large hole on the wall, of course, if the hole is too large or need to use cement.

57, frosted glass, not stained with the back of ten million to protect the paint, is difficult to clean!

58, Caipen leading back of the hand switch must be used, that must be not easy to keep clean fingers, the hands are turned up when the oil is also difficult.

59, the price of luxury automatic racks too much water, and found some of the more well-known mark is not on the structural design but better than the brands, prices are much lower.

60, could be considered safe on the ground of the metal socket, the socket 100 is very expensive, but very convenient, usually flush with the ground, feet a foot on the socket can pop up. Suitable for large living room. Or security in the dining room table below, to insert pot (to prevent hanging back and forth when moving wires)


61, cache room. TX has been said, but I did not do doors, looks very beautiful, and easy to put filthy raiment cabinet.

62, starting bed frame (the so called it). I am a professional company to buy the fabric bed, bed, and spent 350 yuan plus a such a thing, end of the bed there is a pull handle, bed board will turn up, exposing the bottom of the storage space, Terrific Oh!

63, is not practical double-pole towel rack! Current and single-pole uses the same basic look forside layer will not be hanging pole and then drying towel

64, that is not practical cabinet inside the trash can, as on the outside. There do not install the door and the table plate of the trash bin, open the door when the summer will be very smelly. Trash or on the outside good.

65, the table next to the small cabinet, and can be placed on some stuff, very convenient.

66, ashore I consider the mop tub less demanding in terms of rendition, can convene an yourself out, covered with tiles and match the circling environment alternatively the mosaic that is beautiful, and retention money.

67, the bathroom can fix identify point of hook to hang something.

68, designed a bathroom cupboard to put clothes, no longer must worry about bathing forgot to clean clothes.

69, suffered a caustic practical washing machine with dryer, in addition to a year, only the yellow mold-day, and the malign giant. Thick clothes, towels or drying discontinue, let the sun more than a good user disinfection. Even been overdrawn, you need to save the point of silver.
70, even in the laundry room to do a laundry pool, used to hand wash something. Originally thought to use less, so buy a very cheap Terri leader. Did not think this is really convenient laundry pool, became my most frequently used a home washing area. What rag ah, socks, ah, to towels, ah, all in which to wash, even the most hands there too.

71, fitted with lights is not really practical, not the decoration finished now opened. There are just SHOW guests to look at lighting, I simply forgot their own also installed a this thing. When the original is to open PARTY under mythological, now do not have much become of opening spotlights.

72, most fitting experience is actually as simple as possible, less pollution, less money, peace of mind.

73, useful stuff:
①-designed storage room.
② North Terrace used to wash dirt sink. Differences between the bathroom sink and kitchen sink washing trays and vegetables.
③ bathroom to wash your hair you can pull out the leader. (Wash basin was never the TX exceptions).
④ easy to clean the floor and the right cleaning tools.
⑤ kitchen work table bulbs.

74, to buy their own toilet must be a good amount of pitch, or go buy a return that is really ... ...

75, posted WeiChu tiles after a good amount of what did not dry before the best level, the lowest point is not to look at the leak, or other dry and then passing the money and decoration team, a lot of dead compartments.

76, ledge stone with the Great Wall of beads Angeles, is a 800X800 tiles. Manufacturers cut good milling, Mason posted. Pattern did not look good also
radiation.

77, bathroom shower room must be massive ample size, and use transparent glass, so there does not appear cramped shower.

78, should not use white cement tiles pointing anchor. No month into a dark seam, hideous death. The results they have bought their own anchor pointing deputy, that weary

79, the cabinet should be under the artificial stone after the board of the pad, the result is not found after installation, are now afraid to cut the mutton in the above, agreed to give me almost two months have not installed installed (only to grinding a).
80, do not believe the spell of the designer. Of course, you can visit more than several decoration companies, from each design to extract the real useful things, the key is you want to pretend to look like home improvement.


81, if the floor drain installed the original developers have the kind of harm smell of the

82, additional bathroom floor tiles after a good test the water, if water is relatively slow immediately rework. Our household's water is relatively slow, then relented a bit, now it is always a little bath water, and made hundreds of our main Guardian silver shower head is laze, it always marveling how to treat.

83, fitted wash basin and mirror to be considered good, put brush glass rack, towel rack relating rank.

84, to consider when buying a mirror the mirror front lamps, if you do not want to install a transient mirror front lamps, mirrors the size of the mirror to be able to cover for the best line of headlights reserved.

85, put the washing on the balcony to be a small cupboard, easy to put some debris, such as washing powder within the debris. Both beautiful and practical

86, must be seeing at act upstairs upstairs trickling water .... otherwise, obtain a hanging cabinet, the wall is a muff ....

87, do not blindly follow the buy online, I later discovered that some of their own to buy cheaper than the bargain.

88, TV wall must set a few more outlets, television, DVD .... a put, you will find enough outlets.

89, change the water well in the future to be considered before the installation of a large specimen of wash basin, case in point, the left or right pots pots, water and drainage that is located where. Otherwise, changing for the better after the breakthrough period of the wash basin is fit!

90, on the curtains, we had better put your stay a size goes, the employer shows no less size. If less, then how come the. Or saw him cut his fabric.

91, the decoration of the construction process:
(1) approach, tearing down walls, walls.
(2) bathroom, kitchen floor to do 24 hours off water tests (required the developer to complete this mission).
(3) cutting trough, water reform and acceptance.
(4) seal groove hidden underground water renovation project, closed water leak test started without waterproofing.
(5) bathroom, kitchen wall spliced disk.
(6) Woodworking approach,GHD IV Styler Straighteners, suspended ceilings, plaster moldings.
(7) packs Door, window cover. Making wooden cabinet frame.
(8) concurrent production of wooden doors, door style and platen.
(9) wooden panel paint brush dust (food vegetable fuel).
(10) window leveling laying marble countertops.
(11) neat plate, pasted, nice line making and installation.
(12) wall of primary treatment, grinding, leveling.
(13) utensils, door seams paste adhesive (protected side).
(14) ICI at least three times the oil the wall.
(15) furniture painting approach, eye patch and paint.
(16) dealing with corners, laying floor tiles, wood or composite wood flooring, waterproof marble bar, the baseboard.
(17) lighting, sanitary ware, handle, door lock installation.
(18) cleaning health, tiles fill joints, dismantling.
(19) decoration prelude acceptance among the company.
(20) three formal acceptance of rendezvous, delivery owners.

92, the valve back together before the flue must be clean to assure the valve can switch freely and able to open to the most, otherwise it will affect the effect of smoke hood. Ceiling can be installed to remain two not installed, so the hood and attempt and correct installation of the ceiling and then installed.

93, so much in the living room and dining room dome can not do not do.

94, take the line in mandate to better air-conditioned spaces, the power as much as possible closer to the air, so air-conditioned to see a length of rope, leaving a trace of apologize.

95, the house in human to weigh and record the manifold sizes obtainable, can be Broche size chart size and then re-covered wire apparent the final size will directly affect the decoration and furniture purchases.

96, the small size of line is not good if the voting is not always black walnut air, then the need for trade-offs, or to accommodate actual or devoted their own ideas, of course, the best do both

97, began looking for decorators. In terms of personal experience, if I were you particularly large family and intend to simple decoration, the guerrillas seem to find something more cost-effective. After installation it is best to introduce others, you have peruse and agree to the eyes, especially the consciousness of the person in charge of the decoration is even more important, responsibility and appreciation of how, some of the sometime is more fussy, because if it were not for a stripped-down, in fact, those who live almost fooling the will to do, but the quality is good or bad may depend on a sense of duty.

98, the main furniture such as sofas, wardrobes, dining charts, chairs, cabinets, etc. in advance to see more of the best also, if the fleeing around on tired, you can find a few good large-scale home shopping plaza shopping, the basic trend to see it, so then you have to do is slowly along to their lusted manner filter out the right things. Some people take a good style, some folk have precise grasp of color, it does not matter, anyway, there is time to consider, if you wait until cleared decoration, furniture, help wanted to see the steps and then reluctantly accepted the unavoidable end will not actually like it.

99, already optimistic about the best furniture to size down, and then to the room's decoration of the virtual future.

100, buy something necessary documents be sure to keep the move on the latter may exist back, a replacement is absolutely useful. In particular, some important items of the store receipts, leaflets, etc., because a lot of things have a warranty period, testify lost would be more trouble.


101, the process of construction projects are sure to boost or diminish the price they asked for and then write it in black and white.

102, retard for the required construction of protective measures, such as entry doors to use jewelry cotton mantle, window and floor tiling good must be properly protected.

103, as much as possible to communicate with construction workers, to make sure whether he understands your purposes. Put themselves in respect of each teacher's work, respect, the importance of people feel at home, then began to live it more responsible to do so? There is an old saying not to ask (But if you are faced with treacherous cunning bully who, it would must revenge, dispute) in particular to some of the edge of the project is the need for several types of co-ordination, responsible workers with each other and coordinate their respective duties, Otherwise, we pass the buck back and forth, all pass the buck. I like Mason to help me solve some of the carpentry of things, and electrical and solve some of Mason's problems. Because each teacher's experience is different, by the time he is willing to help you find a way.

104, do not do the best furniture fixed, for it no longer may be some alterations in the layout. If we do we must grasp the quality, or infinite difficulties.

105, be sure to change the water carefully, one costs money; second, if not the ceiling from the floor must be laid down in water, if water problems big trouble.

106, according to their actual needs and rational preparations for wiring, so as not to waste (especially the cloth with a lot of lights and lighting if only practical, we must also try to avert the series to use, waste electricity), but some places can not be Province, for instance, afterward to the bathroom mirror, and often with a hairdryer and razor; well inside or below if the shoe has a socket is also good, shoe apparatus can bake, I am now very sorry that no cloth lines.

107, the bathroom as wet and dry area, if the area is small with a base like (special glass basin was dirty, inactive admonition); conditionally set a waterproof cabinet incorporating a small debris is best, put everything surely does not look good on the outside.

108, wood glossy white paint brush than when the nitro-polyester good (this is to listen to seasoned painters talk).

109, the cabinet must be selected carefully, to look at several of the quality, we go to do a solid strong as this one are easily thousands of ocean, but also narrated to the stove and sink, etc., they still do not blindly mercenary cheap good. But best not to do in the cabinet table or inside the trash can; if there is limited funding, basket, basket seasoning, rice bucket of what you can do all of these accessories in the cabinets sell the company in general is very expensive.

110, wardrobe preferably than not less,GHD Classic Styler Straighteners, preferably large not small, women memorize! Hanging space to be able to put up the clothes.

111,GHD MK4 Gold Straighteners, bad handling glass or mirrors in the neighborhood of the best things to buy, or Be ready to transport methods.

112, curtains all the best in furniture, appliances and then customized approach to match the overall style tone. However, before cleaning the track can be installed.

113, change the gas pipe is best done before tiling, or may damage the wall. Best to let the gas company to paint a figure or on the wall as an arrow, because the cabinet company to be required in the cabinet body prologues.
114, cabinet installatiin season is longer, ranging from 4 to 5 hours, as many as 2 days, must be psychologically ready. Installation can be used to check whether the material is that you set (you can see via the hinge hole cabinet material). Installing kitchen cabinets before the first clean look, because once installed cabinets, no way those dead ends and then cleaned.

115, furniture installation is best looked at in the next, especially as the wardrobe of the laminates are several holes selected, I was not looking at the results too small a distance between the layers, hanging clothes stretch not open, even after adjustment.

116, taking into account the formaldehyde pollution of the environment, such as spider factories can be placed in the green room, furniture in all the open doors the eruption of odor, but also buy a special spray to eradicate the smell of things to come.

117, installation of combustible gas, booking gas ignition.

118, brush wood of the time: the best Puwan other room painted tile or wood floors. If you have to brush it, the best have the room cleaned. No floor tile or wood floor room, the room a lot of dust, then brush wood, then brush off the dust easily attached to the wood surface, wood products, have spiked sense does it feel, which although can be higher tag of sandpaper and then brush it again to solve, but in the end it feels to feel the brush and the overall effect will be discounted RBI hit. Room Puwan tiles and then brush, then the air of dust content defect in ... than the shop front, with hardly no brush again after the dust attached to the wood surface of wood products. This is so because when they run into a small decoration Wu case, I had decided to buy in Canada Wood had seen it like a brush effect, and feel very smooth, feels like my home-improvement Howley, like wooden doors. Only because of the above, the results of the effect to play a lot of discounts, it has been a matter of regret Xiao Wu. And plus I like the union buy the paint process, the students also arose in this home. So here remind students to pay attention to it. I do not know whether other wood case, but according to the principle of same reason, so here remind students to pay attention to it.

119, on up painting: painting preceptor pay is so dry and then batch finished wall putty, putty dry after painting. After brushing the paint if no reason is necessary to install lighting and a kind of electrical switches. Ask something to install lighting and electrical switches to remind the teachers to pay attention to this and installed a clean Sin before hand, so that when installed will not be a dirty wall. Thus saving a touch-up painting processes the. Of course, soiled walls, the decoration is to make sure the paint department team to pay up painting again, that is to get clean and dirty walls (if the paint companies, they also allow teachers to pay to make paint, If you pay attention to what a lot of paint division will be left in the part after brushing the wall paint, which is the remaining part of the paint used to make paint). Just note, do not let install lighting division to pay tarnished walls, you can pay less to make a tumble to the paint division (at least half a day), but also facilitate a lot of our own, then why not? Sometimes, with people easily, also has been easy. In general, paint the walls will be wood finish brushing before, this is to avoid the Wood in the process of dry brush will paint the walls of the wall impact. Of course, in actual operation, you can also Puwan after tile (floor tile wall putty prior approval has been good) painted wood, and other dry before whitewashing wood finish, but to do so, of course, will affect the period. If the fear of affecting the period of the case, but also in the air to reduce the effects of dust, then a lot of points to be hard-working about cleaning the room of the health of the.

120, the decoration team selection: The first choice guerrillas or formal company, I think is not important, the opener is to give you the head of the construction team is serious and responsible, the decoration of the capabilities of workers, of course, the quality of the decoration and prices.
First, find the decoration companies not more than 4, for the most part, so, if your time is very rich, it is dissimilar matter. And decoration companies to talk about this before, must be clear that you must do renovation projects, you can cry the company reported that all the decoration items, compare prices and comprehensive after taking into account the following factors to resolve which items you want to outsource Which item of decoration companies do.
the decoration of the people, the decoration of the offer as low as feasible, of course, inverse to the views of decoration company. Sometimes the decoration company to Mohr-McClune, will offer some of the weight is relatively low, this way, the quality of the projects and the quality of materials is more difficult to guarantee. Fitting so many, you want to unattached item is the lowest, it is unrealistic. And decoration of the offer, not only the number but also depends on the contents inside, the materials used in this project, specifications, brands and so on. You know, the decoration of every offer, in fact, are of excellent stress.


121, the construction? Since I am in no hurry to push in, so plan to find haphazard workers: the neighbors a good home please artisan, may be I look for the object: a mason, a carpenter, a plumber, a painter. Design step by step step by step, I believe it slowly and deliberately.

122, to use every penny wisely: look at the decoration materials, they must be dazzled look, there are so many good things, and it seems every one looks the same, the economic can resist . May be a short phase of time necessary to purchase these things in place, the economic pressure is really big. Most people at this time is often in muss, the result too much over allowance the last one, the second is to buy good quality stuff at the United States, then buy something is uneven.
My view is:
one pre-determined price, after the election materials.
excess of the expected price of 10 percent-of material goods, do not waste time. Business consumers always fine too. I am doing a detailed timetable of materials needed in the future blog post will be posted for your reference.
Second, province to province, the spent flowers.
the most valuable place is carpentry, kitchen cabinets.
most disposed to water quality problem areas are transformed, kitchen water.

123, the cost of furniture than to buy some furniture. 500-700 yuan per square meter general furniture.

124, covert project was not the most important place to save money: water circuit transformation, water treatment.
way to do is to ask B & Q, B & Q now have individual decoration services: such as water reform, since the purchase of materials, water per meter of $ 40 per meter circuit is $ 20 for half a annual warranty. B & Q on the first floor in the eastern of the detailed individual services and offer announcement, we do reference

125,, the easiest way is to use online resources to gather, retain, achievement the integration, the future will be put to great use.

126, in order to save time, cultivate efficiency, decoration materials on the market each have a harvest, a detailed and practical procurement schedule and budget is important.
Program list by room species purchase is easier to implement: each took to the streets to see things the same room, to facilitate approximation and comprehensive
together, likely to have success.
one hall project
Second, the alive room project
Third, the restaurant project
four master bedroom project
five children
six housing projects, study projects
seven main Health Project
8, nine passenger Health Project
kitchen project
ten, balcony engineering
XI Yin Taiwan project
are listed in the plan to put my own post like the following table, for reference: data in the table as an example.
This list is more convenient for acquisition planning, pre-construction projects may be suitable, by job re-classification of the merger, into masonry, carpentry, electricity, water, paint and other re-watch. The right side of the table can also be added in the If (three batches of three wall paint brush; shoe with Albert panel, brush polyurethane varnish), etc.

127, home cinema rear spokesmen, the sound to be embedded wires in the living room under, this is very important!

128, add a sink on the balcony, decorated to embedded pipes. Balcony sink is very important, gardening, washing hands.

129, toilet, kitchen need backdrop melody, sound audio wires embedded before the renovation.

130, both sides must be left socket on the balcony, hanging lanterns, when the New Year, good power.


1: the bathroom is divided into rainy and dry district 2 wet zones of the floor drain on the better
2: If you scald normal gas water heater attention to the bathroom to have ample ventilation settings
3 - 4: If you do not know, then you can ask a professional friend to companion the master now prevaricate more.
11: hydropower, or find professionals to help themselves because the features in this respect he is to inform those who design their own needs to be transformed in the transformation of migration, but if there are problems when the house until you have installed the
line problems and must re-do the demolition of the wall is a very huge head thing.
12: toilet water to rely on their choice to tile bathroom floor tile is a vocational waterproofing has to do this at time of purchase, but you can recess guaranteed water to do well because of devise problems in the choice of size If you meet after the designers got the idea he would not tear off the bricks to fill the floor so that you destroyed the original design of good waterproofing,GHD Purple Styler Straighteners, floor tiles, floor tiles are of way so early you can find out, but not your home is to live for decades we need a long-term certify so you must pay attention to the design of the bricks in the sidewalk without being devastated
19 when the fusion is now bought ready-made cabinets are the most direct is because the family The water issues need to be near to build the design, of course designers in adding to water designed to inform the designer must determine their own homes who are often under the kitchen cabinet so to better determine the scale so that when you cook at home more cozy with the cabinet panel recommended to choose such a large load to bear safe



white cement tile grouts and usage is not the same, but the masons are usually filled with white cement tile grout filling usage, so epoch, gone sealant, sealant, and a little morsel better to be pointing to the wall instead of doing the paste. Also, the cabinet hinge, pool water, so use a good switch, while the cabinet fabrics, pond cell body, bolt can be used in common, of course, if you will not attention about the money.
If not a big package, I recommend to buy establishing materials as much as possible to homes in the East, was home, B & Q and other places to buy can be returned.
131, at the entrance to the light switch, it is recommended to use sensor-based. Black day to go home, save the dark.


132, shows a basic construction, water, electricity transformation
(a) the construction team on the water before entering the construction of a minute test, before they are allowed to change tubes.) and can beat down the plaster layer, load-bearing walls for installation on the
(c) in the buried line pipe Such as the need to change the original line, and can not use
(d) circuit to be buried in the dingy wall of the best
(e) strong electric
(f)



133, waterproof
(a) kitchen, Wei
(b) 30 cm from the wall to do it twice, more than 30 cm can do it anew, wrap need water at the door pocket door.
(c) waterproof finish to be dry, a Redo waterproof layer. Where leakage is most likely to


134, tile
(a) in the selection of tile owners of tile required for quality finds its way: first look at its color is uniform, non-variegated black specks and holes the line; followed depends on whether the standard of its size, the amount of tiles with the tape measure the length and width, measure the size of the trademarks to its factory the same size, then the amount of its crooked tile, such as crooked line, the tile is positive; then depends on the flatness of the tile, the most simple and telling method is to tile the same brand of two overlapping positive and negate, such as two stacked meaningful gap between the tiles or you can rotate the tiles irregular; last look There is no color tiles, and is out a few samples of the same type of tile, compared in the light, such as do not see color differences can be ordered.
(b) After the paste can not have a whole chip of brick tile hollowing (partly hollowing the plenary chip of brick can not surpass 20 percentage), if the entire chip of brick hollowing be rectified, beneath regular circumstances, posted 100 per brick, brick wall tiles are allowed to have a hollowing, to grant 2 brick tile is hollowing, but must rework, rework the chief stuff (yet counted in the loss of) from them, such for Over this range, the chief material from the construction side is responsible.
(c) Normally, the level of tile degree of error of 2 mm is allowed, the gap be the same tiles, bricks and tiles should be flat on the corner (allowed error of 0.5 mm), kitchen, wall tiles in addition to health bricks and tiles should be flat on the corner, the need to level degrees (allow 1 mm tolerance) and vertical (allowing 2 mm error) to achieve, bathroom, balcony to the floor drain tile should be considered, you must first put away the slope, if there is no special reasons, there is water.
(d) in the walls and floor tile Puwan necessitated after the


135,GHD New Wave Limited Edition, anti-termite
(a) and finish the wall after waste accumulation trough, a comprehensive anti-termite (ie, whole-house spraying of termite drugs)
(b ) After entering all the plates in need of anti-termite treatment (specifically for anti-termite wood like to do)
(c) before the need to shop for wood flooring wood floor to shop floor to do a termite treatment
(d) termites spray to wet the drug is better (you can apparently see the wet)


136, the computer is also a design study, and now the calculator has multiple functions to set the decimal point, making computing time will have different standards, so we need to send a computer yourself, there are now calculated on a cell phone functions, but function is not necessarily good.


137, to arrange their own two good neutral glass, plastic (1 clear, 1 white), recommended the U.S. General Electric Company, B & Q for marketing, 49 a. In the installed bath room, sink, cabinets, security doors when they need it. While the general factory installation package will come with glass, plastic, glass plastic, but most of them needy quality, the future is easy to change color or moldy.


138, if necessary a last resort, do not use toilet seat shifter. This material is very promising to occasion clogging toilet bowl water.


139, pantry Lvkou Ban, hood top two, a good cavity must be completely installed so hood up after security. An up my family's early and afterward time and clear the hood to install, dismantle dismantling equipment, workers are engaged in out of fashion, has transform a seamless ceiling ceiling of the seam.


140, if in order to unify beauty, kitchen and bathroom doors are installed, and that presently after installed in the door marked with ground glass joints where glue. I do not have time for the processing, water workers are not scrupulous, a lot of water splashed on the floor bleeding to the door frame, the following part of it has little black (mold) of the.


141, must be tiled balcony! King balcony to angle around to mart, mart to live with the railing to the balcony with the high. My family view balcony to balcony wall angle and the life is not paved, but to prepare a bucket of exterior wall, they periodically refresh ... ...


142, sealed in the wall before the water reform must allow the master to invest careful decoration water map.


143, as if ready to brush the wall color, the transformation in the power line when necessary to take into account for the problem. Changed a lot of my family line, air-conditioning outlet bit all changed. But in order to save money, not for the whole line, but wiring. This wiring must be installed where the whiteboard for future upkeep. Later, brushing the wall paint color, etc. only to find how these white glare, regret ah ~~~~~


144, which is the lowest level I made an mistake, I imagine that the 1.5 m bed width is 1.5 meters, forget the thickness of the bed there. Very accurately in bedside lamps to stay well back of the wall socket. As a result, there is no socket to be blocking the way to use.


145, started before the captain to make analysis of the wall decoration how to deal with the need to spade out all the original powder. In particular, ready to paint the wall engineering companies outsourcing to students. My family is contracted out to paint companies, such as carpentry finished painting the walls look gray to know the original is bad, it is best to spade out the whole re-Pihui. However, woodworking has been done, to shovel the ash out of the original bad action. Finally had to brush the surface of a layer of paste Pihui 108.


146, increase the line will certainly be re-wiring. But from the nearest extremity branch wiring. The increase is not allowed in the original wire connector on the wiring.


147, air-conditioning control alternate only in the power supply side. Added line on the road is not allowed.


148, change the position of call and network lines, they can out of the original cloth of the line to proceed to use. However, if the unfit construction there will be numerous invisible dangers. So it is best to carton from the room as weak lines.


149, the transformation of the workload calculation circuit, generally in agreement with the wiring in three different ways were measured.
(1) play slot pipe (measured by the length of trunking, if a tank more root canal, according to the number one half pipe the other half comprised in the overhead line).
(2) on the head of line (wearing tube not play slots), calculated according to the width of pipe.
(3) for cable, according to how much even if the number of replaced (replaced the line to acquaint the construction team do not throw).
(4) weak transformation, according to the first method. The difference is who is to pay attention to weak-line purchase. Owners will have to buy less wire prices.


150, nailed the toilet to the floor, buffet the screw with it? There is assembly at the pedestal and the pipe, to buy what were sealed and the outdoor is better: the restroom is fixed with the expansion screw. The interface between the base and the pipe by the inside with a special sealant toilet. + Out of white plastic with white concrete slurry deployment. When the toilet is generally purchased with a special sealant.



151, buy the materials themselves must first calculate the approach sum. To buy water when the material to do the latter anyhow, preoccupied about painting with the sea chart in the end how much material came out, so what little trust the boss, the result was base to buy water 5 meters, the actual use 27 bronze published one, actually bought a 40, should the remaining 13, seven short of the actual remaining six. Under repeated answering from additional sites back up foreman Detailed measurements of the pre-circuit their own material, the calculated results and after comparing the boss of the requirements: from 30 m to 12 cord meters, network cord from 20 m to 13 m, additional issues such as insulating tape, plug both large way was I correct ... ...


152, if the old water pipes under the ground, in addition to the drip when the switch is often damaged, do not hesitate to be laying a new, do not save, to ensure safety .


153, the kind of retraction on the bathroom walls, the mitt do not waste space, and posted a very good very pleasing tile. Of course, tile alliance that trouble to say


154, sun angle tile lines do not use the income side, 45-degree angle to grind bricklayer splicing was beautiful, of course, you do not choose Tijuana workers lazy way to do things.


155, aluminum pipe, when installed must be sealed cement workers under the supervision of the construction standards to allow expansion space for hot water pipes. Short plastic tube not closed mighty, and loose some of the good thing.


156, auditorium bathroom on the ground if the ratio is high, the transition can be used to solve the door stone.


157, plus move the sewer pipe mouth, then in the new and old sewer pipes should be checked before the entrance of the old sewer butt is smooth, this time a lot of money to clear the bit to avoid future trouble.


158, Lvkou Ban did not need to buy high-priced, very cheap Lvkou Ban the effect has been far better than PVC, the more money I can not see significantly different results .


159, buy Lvkou Ban particular attention to the keel and not Lvkou itself (Lvkou goal is not easy to tamper too much), usually on the keel complete ghost.


160, brick color is difficult to find satisfactory, I did not find, but the two kinds of color are not satisfied with staggered mosaic sub 45-degree angle I was able to achieve satisfactory results. This is indeed the bricklayer himself put forward good suggestions.



161, under the supervision of the ground water offensive to use my bricklayer but not directly in accordance with requirements of throwing on the ground, it can even do! It is not the best yourself, do not perturb but assured.


162, the tilt of the bathroom floor before tiling to consider the good, the slope is not in accordance with national standard to achieve the effect of rapid drainage, and if you use a deodorant or a svelte floor drain floor drain will be greatly additional drainage problems. Some people say that steep slope and pretty, I think it is nonsense. On the contrary larger slope water to rapidly run a clean is a very refreshing thing.


163, platinum-point doors fire with the LG panel, the effect is good, but if we might consider fitting tailor-made finished door. Hand-made door is not fine, for reference only.


164, sink a large mart brand-name price is not cheap, brand-name quality outrageous bad.


165, the balcony door is best to use the same type of blaze board. Balcony environment is bad.


166, bathroom vanities to do when the first cabinet to consider the size of the basin so that the hereafter good eligible.


167, the glass is ponderous stuff, the best buy in the vicinity, or Be ready to transport methods.


168, install the bolt bolt head to pay attention to some wax, wax on and then crashing too late. If you do not smoke, then also pay attention to the door handle to prevent wall damage.


169, matte paint namely pretty high and light, do not hear apt the painter, and if a bad brush matte painter said that its technology must be wrong. Similarly, if a nice painter, said polyester polyurethane namely not trick your


170, with insulating tape and raw materials do not buy in the store, large supermarket quality was much better, and full weight, conversion down the price is not expensive.



171, if the re-decoration will be used instead of talc putty finished, no big cause is that finished product easy to use putty. Fired the painter, especially after his own experience when diy - talc tone putty sick of it.


172, installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original will want to save wages outside the old junction box use, recommendations on the interior to get a new electrician, he now found it very valuable suggestions. On the interior door is not ugly, it really easy to use!


173, large interior design company directly to workers on site clearance work package may be more appropriate, and better technology, tools, more


174, and air leakage protection switch to use the brand appoint. I use the Want to buy the real thing is simple, direct phone check MGE headquarters phone number, and then played to ask the regional branch number.


175, the audience slight pots kettles than on stage, good-looking, good cleaning.


176, basin faucet with the audience to pay attention to, taking into list the thickness of the basin brim, leading to the jaws longer.


177, the hole before installing the toilet is a big, large floor drain cover can fall off, if your floor drain has been installed and the toilet is not installed, do pay attention to the floor drain cover, or the floor drain cover it up elsewhere custody 也好.


178, buy silicone, then the utter best always imports of GE, GE emulated along Shanghai packaging. Of course, if the kind of area in a very important factor 7,8 can also be used, for example, aluminum window frames with interior Anjiu levels of silica garbage to plug the whole. But use the bathroom all the GE silicone kitchen, value for money!


179, triangle valve should not be neglected, and save much money, if the valve, then triangle, triangle valve can be installed in advance of copper joints are not leaking, if not installed, only the last copper fittings installed on the faucet to take over the baby when it was installed to check whether the internal leakage, the aggregate leakage due to pressure some time to test out the final installation of internal and leading it more safe.


180, even the journal has been renovated to do about those things, their own can do it, do not, but also with the idea, please decoration companies to communicate more with the designer, please construction team to communicate more with the workers, because the comprehension of your ideas, to rely on them.




181, fitting the biggest problem is communication!


182, is not the place, type of kitchen cabinet door designed, BH. Should be designed L-shaped.


183, general decoration, decoration companies, excluding the formal management fares, tariffs, fees accounted for 75-80 percent sign materials, wages account for 20-25 percent sign.


184, in the kitchen to go outside the ground water, since home improvement is to give a time bombard, who state clearly whether Shashi Hou for his trouble.


185, if the separate tube wear, but in a tank, the impact it? Effects can endure


186, ask what between the dining and living room separated by the most cost-effective package door pockets, side bag only 6 cm or contaminated with white,GHD Kiss Styler Straighteners, height 2 m is not significantly large High crude.


187, respectively, to strong and weak electrical displacement pipe, can be separated away the best, keep the distance 10 cm or more, but it can be difficult, because most families to save money and open a slot. Weak sound the same line can see the tube.


188, inside furniture, paint and glue board can do a good job and opened the door and ventilation doors and windows at home, merely to non-pungent savour. In truth, you are using a good lumber essence board, do not deal with furniture inside.


189, PCT board and the cabinet can be wood core board 15, the back of the 5 available folders, Wuli. Package doors and Tizi use 9 per penny. Different processes with different materials.


190, PPR pipe not only for cold water pipes, also applies to hot water pipes, and even wash drinking water pipeline. PPR pipe interface with hot-melt technology, are completely integrated into the tube together, so once installed pressure test, no leakage. PPR pipe and will not scale. PPR pipe scale never known, not rust, never leaks, high water of green materials.


191, paint board is good, the advantages of both wood and composite.


192, do not print for a long time on the wet pretended stone, unless you want to dry a typography table; not take long wet cutting board on the table. Wood wet sometimes fade; rub the smudge with a steel ball, like hand squeeze pimples.


193, can use an ordinary gas meter cupboard door sealed in it? Need to use the shutter-type door it? Regularly check the ventilation opening on the line.


194, clear contracting the tx Please note that you must validate the renovation team to open a catalogue of materials. There may be certain about their estimates, I too believe that they, and the results to buy wire and cable management nearly doubled.


195, the size of certain blueprinted sanitary ware, the best limn in advance, calculate the size.


196, buy the production the students pay attention to the door, if you want to pursue results matching panel with a business package Door, then you may have to be Henzai knife it!


197, Re: installation of water pipes before they take the leading and basin, sink have bought?
not, just make sure where is the basin faucet, bathtub faucet, bathing machine what's on the line leadership, leading 99 percent sign and fell into the water are in line with international norms, at all times workers are not thoughtless, all right. If you own basin cabinet, basin bought in advance, or optimistic about the size. Determine the amount of units in front of the sink a good size, front loading station to buy Haojiu Xing, do not forget the audience or on stage. Distance between hot and cold water pipes with cement tiles must be sealed before the 15 cm precision, and must be parallel. If you have bought, it is best put someone, such as sealed after the unload.


198, if an 8-core cable at the same time take the phone and network, will not interfere with each other it? Not. 1,2,3,6 hit the cable module, 4, 5 playing on the phone module, and the other two easily. Right in saying that my experience: 10M 1236 100M to be used with the fact that the speed to 10/100M that we will not feel any distinction if using a 8pin line, then some program-controlled switches marking will cause the network marking interference in the home environment generally will not have any problem. But rest insistent that I can recommend such a detach path to the future, depart margin, cable is very cheap you say?


199, check the delivery box must be properly installed.


200, fitted bath and shower faucet lesson taps interlocked to the tube is embedded in the wall, I have again told them to get accurate measurements, do not install when the time is not on. The results left the hot and cold water spacing is 15 cm, can be hot and cold water pipes are not collateral, the results of the water feeding the electrical dictate of the force was the placement. Yesterday I found that fb GROHE thermostatic mixer coating even be forced cracked. We can be installed if the governor, the first installed it. Should be the first leader to buy back, and then install hot and cold water, tiled bar. Oujia bought a very early guide, is Oujia master to buy.
  Reply With Quote

Sponsored Links
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 03:51 AM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum