Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Free Advertising Forums Directory > Message Boards Directory

Message Boards Directory These are similar to forums, but the posts are listed in chronological order and not by category. They also dont require any registration.

Reply
 
Thread Tools Search this Thread Display Modes
Old 06-05-2011, 02:04 AM   #1
S3k1t3s1v
 
Posts: n/a
Default 200 elaboration tips ( marital , nomaritaled have

1, the partition will not be the first shoe, leaving a little space so that the shoes can leak into the base ash, sink and gas stove top mounted lights. Given the location of the bathroom floor drain must first think well, a good amount of size. To drain the best side in the brick, if the bricks in the middle of it, no matter how kind of tilted blocks, floor drain will not be the lowest point.

2, bathroom, air conditioning, no outlet design switches. Especially the bathroom water heater to a couple of level switch with a plug appropriate. To off to electric, pull the plug risky

3, on the brick portion of the treatment of sun angle, the final thinking is to look at the workers level. If the level of good workers, plasterers, and better tools for grinding ceramic tile, they should not hesitate to choose the train of grinding a 45 degree angle. In effect, as long as a good grinding, grinding angle of 45 degrees in the positive approach is the most beautiful! If the level of the workers do much, then you still choose to be positive angle, because the bad grinding angle of 45 degrees angle of approach is not as yang effect of story.

4, line up the pipes after the water pressure test is also very important. Test, we must be present, and the test for at least 30 minutes or more, conditions allow, rather an hour. 10 kg of pressure, without any cutback before the final test.

5, when the steel doors steel door must be considered a good size wall frame protruding inform the installer, production the final frame and affixed to the wall tiles are flat finish, so not only beautiful, and good health to do.

6, carpenters and masons of the package Door tiling is to knot in, including door pocket of the time, to consider the following ground (the ground side of the door either side) is also affixed to ceramic tiles or other cement mortar matter because the door pocket before the nail if the tiles stick better, has archives to the ground, with cement when the future, if the cement and Door smudged, moldy water will occasion wood Door

7, under the mattress and the bed board must be breathable. Bed board is best for general use cedar board

8, do the paint as much as periodical tape

9, buy a lamp to note: General tried to use glass, stainless steel, copper or wood (shelf), and generally do not buy any other coatings plated iron above, ah, ah nought like paint, easy to fade.

10, washbasin as ceramic pots, glass pots downright Health

11, water and electricity to its own transformation plan, and ask them to open Cao straight line. Watching them draw their own line, the whole line open by painting Cao. Each have their own acceptance Caixing.

12, water must be good, be sure to test the water!

13, many of the construction of a verbal accession into the breach checkout massacred, must be written in black and white, a change in the project are sure to ask what the price, write it!

14, ground floor, if installed, to re-do all the ground re-smooth layer of cement.

15, the kitchen door, or to make a wooden decoration hanging rail wood doors for good.

16, the living room as much as possible to install the power plug.

17, is still to be done outside the bathroom shower section. A shower curtain can not pull the easy way wrong, real inconvenient, water everywhere.

18, do door and border materials to select nice grained materials.

19, before installing the cabinets must be sure your home water is OK.

20, kitchen floor tiles will not pick white.


21, ceiling, pay special attention to smooth putty before wiping Dulux

22, the number of living room lighting should not be too light, simple is better, or like the lighting shop!

23, to buy things that need to be installed as the installation requirements of dealers, it does not contain installation, it must cling to only pay the full paragraph after the installation! !

24, the renovation period, before you collect from business card contractors carry

25, Lvkou Ban the protective membrane is best removed before installation.

26, shoe is best to use shutter doors, deodorant. Edges can leave a shoe outlet, to plug drying shoes.

27, cutting and a small safe place to light.

28, it is convenient restaurant exhaust flare can also be safe, so when you dine peppery pot or do not dirty grill houses the Office of the ceiling.

29, the door is best to plan a place debris in the cabinet, can be placed on top of shoe. The general things, such as umbrellas, bags, scissors, change, eat the medicine, and so on there, so it is convenient.
30, there is no need to use your ceiling, if only too worried about moisture and cooking fumes, moisture-proof gypsum scrubbing brush is recommended to use waterproof paint, my health to do a visitor, very pretty. If you must use Lvkou Ban smallpox, it is recommended:
1, not too expensive.
2, using the net color, especially in the kitchen ceiling, white on the good, the color white unless and decoration style mate, it will easily inconsistent.
3, download their own minds, do not deem selling the vision of smallpox, their vision was warmhearted taint.
4, staring at himself in the scene, closing side is very important, do not let them lax, or leave a dark suture, how to look how ugly.

31, the third day and continued to stick largely perforated tiles, range hood, and water heaters to pre vent lay, and if so then perforated tiles stick better, not easier. Therefore, before the renovation must be selected in the range hoods, stoves and water heaters, to determine the size of punch.

32, although catching into list the custom-made cabinets see agreeable, merely no durable, comprehensive outlooks of some of my classmates online and experience, to counter the framework of using cement to do, inside and outside the sides mallet tiles, marble countertop mart, walls closet and cabinet lumber door or chosen to do. Out of the cabinet to do so durable, moisture-proof. And spent distinct few. Read a good many of his neighbors mention, I did not thump.

33, well after the door pocket, plasterers plaster line to start the installation, wall Pihui works. Comparison of the wall of my house was originally formed, approved 2-3 road on it. Pihui allowed when a gray lustered once, and then brush the handbook, sanding again, after brushing, and eventually twice with ICI paint brush, the entire wall looks smooth and flat, really good. Upon completion of the ceiling wall, a carpenter started wardrobe. Albert wardrobe is 18cm's authorize Daixinban do paste veneer outside, although there is no furniture store to buy so good-looking, but durable, quality should be better than to buy. I'm not terrified of standing vessel board. I am afraid that is not enough to buy. Backplane is relatively thick, buying is thin.

34, other students in the tiling must pay attention to the following points:
① best he can in the scene.
② some less than faultless tile can spliced in the future some workers do not see the location, such as cabinets, sinks, mirrors behind, but also pay attention to tile, brick, etc. Do not waist is more than the workers additional to the position, otherwise You can not see everything in the future, but also wasting money.
③ wall tiles, floor tiles in the glue before the torrent mar must be enough time.
④ sure to floor drain plug with something good out of cement down to prevent clogging. My family just because off the cement floor drain is blocked, and spent 30 looking for the management office to clear, get up a lot of small mire.
⑤ people at the scene, the workers will not be too wasted tiles. Tiling my family when not at the scene, then go, wasted a lot of bricks, it is the heartache, all the blood and perspiration Mimi Yeah.

35, a wall of long, high. Such for a bathroom with four wall, each wall should measure out of its long, high. And then subtract one of the windows and doors of the area. Finally, a mathematical ground area. After the size of the measure you can also get a sub shop selling tiles, they will help you re-match. Loss of 5 percent-plus on the line.

36, the best is a two bedroom ceiling light control, and a door, a bed, lying on the bed save the winter and then it turn off the light.

37, the socket must be considered a good place, altitude, interval. Even first met playing iron cassette location, the latter is found to fair be put away the magazine TV cabinet, microwave ovens, desks block, had to move the position of the first two lofty furniture, and eventually found not merely ergonomic height, but too can not buy a good fit stainless steel cabinet thighs, can only be made of aluminum foot.

38, just around the corner in the hallway of the tube with a good, bright and have that effect.

39, did not take into account when loading the table lamp placement,GHD Pink Limited Edition, it lights not in the navel of the table.

40, bathroom tiles do not use too much dye, one lightly dirty, and second, a long time, too dim!


41, outlet to more equipment, furniture to buy outside the ground to dirt security to consider, like to see more housing, in principle, should adhere to.

42, Lvkou Ban did not need to buy high-price, very cheap Lvkou Ban has been distant better than the effect of PVC, the more money I can not see significantly different results. Buy Lvkou Ban particular attention to the keel and not Lvkou Ban itself (Lvkou Ban goal is not easy to tamper too much), the keel often complete ghost.

43, the color of brick is hard to find satisfactory, and I did not find, however, not satisfied with the color of the two sub-cross mosaic is a 45-degree angle to achieve the results I am very satisfied. This is indeed the bricklayer himself put forward good suggestions.

44, on the balcony on the top cupboard, then hit the back of the cabinet with a layer of waterproof insulation bubble board works well. Balcony door is best to use the same type of fire board. Balcony environment is harsher.

45, if no suitable molding may wish to custom, custom quality seems better than the sample also. More personalized and customized.

46, bathroom cabinets with stainless steel legs are mammoth profits to find some local stores to buy back price of mad cheap.

47, install the lock bolt head should pay attention to some wax, crashing to a December to late. If you do not smoke, then the door knob must be taken to avoid damage to wall.

48, Paco the floor well, I like only to remind the boss about the price may be directly to a seller about the price ratio and better.

49, matte painting is beautiful than the high light

50, if the re-decoration will use putty instead of talc products.

51, installation and air leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original wage will want to save the old junction box outside use, electrical proposals put new ones in the room, and now thathe suggested this valuable.

52, and air leakage protection switch to use the best brands. I used the Want to buy the real thing is simple, direct call MGE investigation headquarters phone number and called to ask the local branch number.

53, the crowd delicate pots pots than on stage, agreeable, good cleaning. Basin mixer with the crowd to pay attention, taking into account the basin corner thickness, leading to longer jaws.

54, without anyone revision of the wall angle is also very beautiful, but to advance the stage of looking for the painter and the painter clearly put forward. angle Ding Jiaoxian do help to play the straight line.

55, online slots before the cement surface, surface treatment approved putty is very important, for no solid surface with a clean ball handling is very appropriate.

56, make plaster appropriate for a colossal chasm on the wall, of course, if the hole is also big or need to use cement.

57, frosted glass on the back do not wrapped with paint to protect the hard to clean!

58, Caipen leader can be sure to switch back of the hand, that must be not easy to reserve clean fingers, hand rotate up when the oil is also difficult.

59, the price of elegance automatic racks too much water, and found a number of relatively unknown brand in the structural design on the front line rather than the brand, the price is much lower.

60, could be considered safe on the ground of the metal socket, this socket 100 is very expensive, but very convenient, usually flush with the ground, the foot can plug a foot to popup up. Suitable for large living room. Or on a dining room table, below, is used to insert hot pot (to prevent hanging back and forth when moving wires)


61, cache room. TX has been said, but I did not do doors, looks very beautiful and easy to put dirty clothes in the cabinet.

62, starting bed frame (which is so called up.) I am a professional company to buy the cloth-bed bed, and spent 350 yuan added such a thing, end of the bed there is a pull handle, the bed board will be turned up, exposing the bottom of the storage space, what a great Oh!

63, is not practical double bar towel rack! Like the present and uses a unattached wand, hanging wand pedestal wafer will not look forside and then drying towels

64, inside the cupboard that the trash is insufficient practical, than on the outside. There do not install the door panel of the trash binary and table, open the door when the summer will be very smelly. Trash or on the outside good.

65, the table next to the small cabinet, and can be placed on some stuff, very convenient.

66, to I think the mop bucket less claiming in terms of rendition, one can convene themselves out of covered and the surrounding environment that is consistent with tile or mosaic outward, and money.

67, the lavatory can point hook identify to hang someone in the anchor.

68, designed a bathroom cupboard put clothes, no longer have to anxiety about bathing forgot to clean clothes.

69, washing machines with drying is not solemn and practical, in addition to one year, only the yellow mold-day, and the evil giant. Thick dress, towels or drying leave, let the sun user disinfection to be good. Even overdrawn, you need to save the point of silver.
70, even in the laundry room to do a laundry bucket, used to hand wash something. Originally thought to use less, so buy a very low Terri leader. Did not think this is really handy laundry pail, became my most frequently used a washing area. What rag ah, ah socks, and towels, ah, all washed in it, and even most hands there too.

71, fitted with lights really not practical, the decoration done up to now not opened. There are just SHOW guests to look at lighting, I simply forgot their own also installed a this thing. When the original is to open PARTY under phantasmal, and now do not have much contingency of opening spot.

72, the biggest course studied is that in fact the simpler the better fitting, less pollution, less money, peace of idea.

73, useful stuff:
① designed storage room.
② North Terrace sink used to wash the clay. Differences between the washbasin and lavatory and washing vegetables for the kitchen sink.
③ bathroom can be pulled out of the leadership shampoo. (TX shampoo basin was not an exception.)
④ easy to clean the floors and the suitable cleaning tools.
⑤ work lights the kitchen table.

74, buy a toilet must be a good amount of their own pitch, or go buy a return that is really ... ...

75, Bath and Kitchen floor tiles stick better after a good amount of what the former did not do the level of the lowest point is not looking at the floor drain, or other teams did and decoration after passing, a lot of dead cells.

76, skylight beads Angeles with the Great Wall of stone tiles is a 800X800. Manufacturers slit and edging, Mason posted. Pattern did not look good also
radiation.

77, bathroom shower room must be large enough size, and use perspicuous glass, shower in it will not appear so cramped.

78, should not use white cement tiles pointing hook. Did not become a black month gap, ugly necrosis. The results they have bought their own hook pointing deputy, that tired

79, the cabinet should be pad under the artificial stone after the board, with the result that there is no installation, it can not cut the flesh in the above, agreed to give me almost two months have not installed installed (only to aesthetic once).
80, do not jumble the letter designer. Of course, you can visit several decoration companies and more, from the design in each extract something really useful, the key is what you want to wear up like home improvement.


81, if the floor drain has been installed by the original developers that hinder foul of the

82, bathroom tiles affixed to the ground after a good test the water, if water is relatively slow to rework immediately. Our household's water is relatively slow, then relented a bit, it was all a little bath water, and made hundreds of our main Guardian have idle money in the shower pate, and prodigy how the aggregate now relief.

83, fitted wash basin and mirror to be considered good, put brush cup shelf, towel rack respective position.

84, bought the mirror to consider the position of mirror front lamps, and if do not want to install a transient mirror front lamps, mirrors the size of the cover for the mirror to be able to set aside the line of the best light.

85, put washing on the balcony to be a small cabinet, easy to put some debris, such as washing powder within the debris. Both beautiful and practical

86, have to be staring by the upstairs upstairs to do down the dripping water .... otherwise, obtain the wall cabinet, the wall is a muddle ....

87, do not blindly follow the online buy, I later found that some themselves to buy cheaper than the sale.

88, TV backdrop will set up a few more outlets, TV, DVD .... a put, you will find enough outlets.

89, change the water well in the future to be considered before loading in the rinse basin in the majority sample, case in point, the left or right pots boils, water and drainage namely is situated in what location. Otherwise, changing for the better afterward the discovery period of the wash basin was not fit!

90, on the curtains, we had better put your stay a size goes, the boss can not be less that size. If less, then, how how the. Or saw him cut his cloth.

91, the decoration of the construction process:
(1) approach, crashing down a wall.
(2) bathroom, kitchen floor to do 24 hours of closed water tests (required the developer to complete this mission.)
(3) cutting trough, water, electricity transformation and approval.
(4) sealed underground water hidden trough renovation project without closing the water leakage test began waterproofing.
(5) bathroom, kitchens wall disk.
(6) Carpentry approach, suspended ceilings, plaster moldings.
(7) packages Door, window cover. Making wooden cabinet frame.
(8) simultaneous making of wooden doors, plastic doors and even pressure.
(9) wooden plate paint brush dust (edible vegetable oil).
(10) leveling the table laying marble windowsill.
(11) wood trim panel, pasted, fine line production and installation.
(12) wall basic treatment, grinding, leveling.
(13) belongings, the door seams paste stickers (protected side).
(14) ICI oil for at fewest three times the wall.
(15) furniture painting approach, eye patch and paint.
(16) dealing with corners, laying floor tiles, wood or composite wood flooring, waterproof marble bar, skirting.
(17) lighting, sanitary ware, handle, door lock installation.
(18) clean up, floor tiles make up joints, dismantling.
(19) decoration preparatory acceptance within the company.
(20) three formal acceptance of assignation, allocation owners.

92, flue gas valve back attach, be sure to clean and ensure the valve can switch freely and to competent to open to the most, otherwise it will affect the effect of cigarette hood. To remain in the installation of two ceiling is not installed, so hood and attempt and correct installation of the ceiling and then installed.

93, so much in the living room and dining room ceiling can not do not do it.

94, good air conditioning in order to take the line position, the power closer to the air conditioning as much as possible, so install air conditioning power rope to see part of it, leaving a track of regret.

95, to individually amount and disc always the available house sizes, size chart ambition be covered 楼书 elements and then re-wire tagging, the last size ambition directly affect the internal chart and furniture purchases.

96, line a bad choice if small size of the black walnut is always enough air, then need to have choice, or to adjust actual or attached their own ideas, of course, be either the best

97, began looking for decorators. To private experience is concerned, if not especially large size and planned to simple decoration, it seems more cost-effective to find some of the guerrillas. After installation it is best to introduce people, you have read and coincide to the eyes, particularly the emotion of the human in charge of the decoration is more important, responsibility and appreciation of how, some of the sometime is more fussy, because if it were not for a stripped-down, in fact, those who live nearly on the outside will do mix, but the quality is good or bad may depend on a sense of responsibility.

98, the cardinal furniture such as sofas, wardrobes, dining tables, chairs, cabinets, etc. had better take a look in advance, if the escaping nigh on the weary, you can find a few good large-scale family shopping plaza shopping, the elementary trend to look it, so the next thing you do is based on their desired manner filter out the right things slowly. Some people take good manner, while others grasp of color criteria, it does not matter, anyway, there is time to consider, if you await until clearance decoration, furniture, help wanted treads to go in the final will reluctantly adopt the unavoidable and not very much.

99, has been optimistic about the furniture of the best down to size and then to display the future situation of the virtual room.

100, the necessary documents to buy something good must be maintained, a move that may exist on the post-retirement, a replacement will definitely behalf. In particular, some important items of the store receipts, leaflets, etc., because a lot of things have a warranty period, the evidence lost would be more trouble.


101, during the construction projects are sure to increase or dwindle the price they asked for and then write it in black and white.

102, check whether the construction is necessary protective measures, such as entrance doors to use pearl cotton mantle, a good window and floor tiling also appropriate protection.

103, as much as likely to communicate with construction workers, to decide whether he understands your purposes. Put ourselves in each respect the work of the master, respect him, and people feel the magnitude of household, and began to live to whether it is more responsible for some of it? Saying goes, is not called (But if you face a treacherous cunning bully, who, it would have to revenge, quarrel) in particular to some peripheral projects is the need for co-ordination of several trades, the workers will be responsible to each other and coordinate their respective duties, Otherwise, we pass the money back and ahead, all pass the buck. Like my mason to help me solve some carpentry thing, and electrical and determined some masonry problems. Because each teacher's experience is different, at all times he is willing to help you find a way.

104, do not do the best furniture nailed, for it not longer may be some changes in the layout. If we do have to clutch the quality, or endless trouble.

105, be sure to alteration the water cautiously, one dictate of money; Secondly, if you do not need from the floor to the ceiling arranged down water pipes, water pipes in case of a problem to big distress.

106, according to their substantial needs and rational arrangements for wiring, so as not to garbage (especially the cloth with a lot of lights and lighting if it were not for practical, we must also try to shirk tandem use, garbage electricity), but some places can not be Province, for example, next to the bathroom mirror, hairdryer and shaver to constantly; well inside or below if the shoe has a socket is good, can singe shoe device, I now apologize not very this wire cloth.

107, the bathroom as wet and dry area, if area is small with a base favor (special glass basin was nasty, inactive with caution); conditionally set a waterproof cabinet incorporating small debris is best, what is put surely does not look good on the outside.

108, wood glossy white paint brush when the polyester better than the Nitro (which is to hear to experienced painters speak.)

109, the cabinet must be carefully chosen, compared to more than a few quality, we go to do a solid firm, because this one is easily thousands of ocean, and related to the stove and sink and so on, so it is still not to pamper in corrupt cheap good. But best not to do in the cabinet table or inside the litter; there is, if asset are restricted, basket, basket seasoning, rice bucket of what you can do all of these components in the cabinets sell the company in general is very expensive.

110, wardrobe prefer more not less, prefer big not small, the women memorize! Dangling from the longest space to be able to dress down.

111, such as glass or mirrors not handling things the best buy in the neighborhood, or first think of a good manner of transport.

112, curtains, furniture, household appliances in the whole approach is best and then made to match the overall style tone. However, before cleaning can track installed.

113, gas change management best tiling complete, or there may be damage to the wall. Best to let the gas company to draw a design or on the wall as a character of the company to be required because of the cabinet body openings in the cabinet.
114, cabinet installatiin time is longer, anywhere from 4 to 5 hours, or more than 2 days, must be psychologically prepared. Installation can check whether the material is used in the kind of set you (the hinge hole can be seen via the cabinet material). Before installing the kitchen cabinets before cleaning it, because once the installed cabinets, no way those die ends and then cleaning up.

115, furniture installation is best looked at in the next, especially as the wardrobe of the laminates are several holes on the choice, I was not looking at the results of the small distance between the laminates, hang clothes stretch not open, even after the adjustment.

116, taking into account the formaldehyde pollution of the environment, such as spider plants can be placed in the green room, furniture doors open all the eruption of odor, but also to buy something special spray to eradicate odors.

117,GHD Blue Straighteners, installation of combustible gas, booking gas ignition.

118, Brush Wood of the time: the best Puwan other rooms painted tiles or wood flooring. If you must brush, the best have to clean the room. No floor tile or wood floor room, the room a lot of dust, then brush Wood, then brush off the dust easily attached to the surface of wood products Wood, feels a tingling feeling, although this can be higher label and then brush again sanding solution, but in the end it feels to feel the brush and the overall effect will be a deduction RBI. Puwan brick room after the brush, when the dust content in the air before the shop a lot less than the basic Wood does not arise another after the dust brush appendix on the surface of the wood products. All that being said, because a small renovation to hit the Wu family location, I had decided to buy in Canada Wood hello seen it before the effect of brush, and feel very smooth, feels like my home-improvement Howley, like wooden doors. Only because of the above, the results of effects to play a lot of discounts, it has been named Wu regret things. And I buy in the organization hi the process of adding paint, some students appeared in this family. So to caution students to take note of here. Wood I do not know whether the other case, but according to the rule of same reason, so here to remind students to pay attention to it.

119, on the fill paint: painting instructor pay is so dry wall putty achieve and then ratified, the putty is dry paint. After brushing paint fraught if no reason is necessary to switch the lamps and various electrical appliances. Ask someone to install lighting and electrical switches to remind the teachers to pay attention to this and a clean install Sin before hand, so that when installed will not be a dirty wall. Will save a touch-up painting processes the. Of course, tarnished the walls, the decoration is to make sure the paint division teams to pay up painting again, that is, the walls will get dirty clean (if it is paint companies, they also allow teachers to pay to make paint, If you pay attention to what a lot of paint division will be left in the part after brushing the wall paint, which is the remaining part of the paint used to make paint.) Just note, do not let install lighting division to pay soiled walls, paint can make teachers pay less for a trip (or at least half a day), but also facilitate a lot of our own, and why not? Sometimes, with people easily, also has been easy. In general, a house painter will paint before brushing the Wood, Wood to do so is to avoid the process of dry brush would paint the walls of the wall impact. Of course, in actual operation, you can also Puwan after tiles (floor tile wall of the putty has been agreed before the good) painted Wood, Wood, etc. after whitewashing paint dry, but to do so, of course, will affect the duration. If the alarm of affecting the duration of the case, but also the clash of the air to minimize dust, then point to a lot of sedulous to clean the room, the health of the.

120, decoration crew choice: As the first company chose the guerrillas, or formal, I meditation is not important, the key is to give you the head of the construction group is responsible, the technical renovation of the personnel, of course, the quality of the decoration and prices.
First, detect the decoration companies not extra than 4, a heap ofis this, if your period is quite wealthy,GHD MK4 Gold Straighteners, it is another material. And decoration companies to talk about this before, must be clear that you have to do renovation projects, you tin phone the enterprise reported that all the decoration items, compare prices and comprehensive after taking into account the assorted elements and judge what the next items you ambition to outsource , which items to decorate the company to do.
the decoration of the people, the decoration of the offer as low as possible, of course, opposed to the views of decoration company. Sometimes the decoration company to La Shengyi, will offer some of the weight of relatively cheap, this way, the project quality and the quality of materials is more difficult to certify. Renovation so many, you want to term items are the lowest, it is unrealistic. And the renovation of the offer, you can not just look at mathematics, which also depends on the content of the materials used in this project, specifications, brands and so on. You know, the decoration of each of the quotes are actually quite an masterpiece to.


121, the construction? As I am not eager to stay, it plans to look in haphazard workers: your neighbors a good home builders are threaten to become the object of my looking for: a mason, a carpenter, a plumber, a painter. Designed to do step by step step by step, I believe, working slowly and deliberately.

122, to use every penny wisely: look at the decoration materials, he must be looking tired, there are so many good things, it seems, like every single look, and economically able to resist . A short time of time to make all these things can be purchased in place, the economy pressure is so big. Most people at this time is often in disorder, the results of the last one too much over budget, the second is the U.S. price of the first things to buy high quality, then buy something is mixed.
My view is:
one pre-determined price, after the voting materials.
excess of the expected price of 10 percent-of material goods, do not waste time. Business is always fine too buyers. I am act a detailed schedule of materials needed in the future will be posted in the post for your reference.
Second, you could save aboard the province, the bloom to flower.
the most expensive place is carpentry, kitchen cabinets.
most prone to water quality problems is the transformation of the place, kitchen and toilet water.

123, the price of furniture than to buy some furniture. 500-700 yuan per square meter of ordinary furniture.

124, covert project was not to save money the most important place: the circuit transformation of water, water treatment.
approach is to ask B & Q to do, B & Q now have individual decoration services: such as water reform, since the purchase of materials, water 40 yuan per meter, the circuit 20 yuan per meter, with 6 months insurance. Details of B & Q on the first floor in the east of the individual services and pricing announced, we do reference

125, the most hassle free way is to use online resources, the accumulation, save, arranging integration, will certainly be useful when.

126, in mandate to save time, enhance efficiency, every has a gain on the decoration materials mall, a detailed and practical acquisition timetable and ration is very important.
list by room category procurement plan is easier to implement: each took to the avenues to see things the same room, to assist comparison and comprehensive
together, likely to have success.
one hall project
Second, the living room works
three, four restaurants engineering
, main bedroom project
five or six babies
housing projects, learn projects
VII, the main Health Project
8, nine passenger
Health Project, the kitchen works
ten, eleven
balcony engineering, engineering
Yin Taiwan is now put my own plans like the table set out in the following post, for reference: data in the table as an sample. This list is used as a procurement plan
more convenient, pre-construction projects may be appropriate to re-classification by type of work mix into masonry, carpentry, electricity, water, paint and other re-tabulation. The right side of the table can also add If (cream paint three batches of three brush; shoe panel by Albert, brush polyurethane varnish) and so on.

127, home theater rear spokesmen, the sound cables to be embedded in the living room under, this is very important!

128, add a sink on the balcony, decorated to embedded pipes. Balcony sink is very important, gardening, washing hands.

129, toilet, kitchen need backdrop melody, audio and audio wires embedded before the renovation.

130, both sides must stay on the balcony outlet, Chinese New Year lantern, good power.


1: the bathroom is divided into 2 areas of watery and dry on the wet zone floor drain better
2: If you are burning normal gas water heater attention to the bathroom to have adequate ventilation to set
3 - 4: If you do not know if friends can ask a vocational chef, accompanied by the now more than a lie.
11: hydropower is still looking for professionals to help themselves because the features in this context also inform the design of their own lives who need to be altered in the transformation of migration, but if there are problems when the house until you have installed the
line problems and have to re-do the wall torn down was a very big head thing.
12: waterproof bathroom of their alternative should depend on the bathroom floor tile floor tile professionals are there to do this in the buy of water manipulation can recess insistent that when you do bad,GHD, but because the waterproof design problems in the choice of size If you meet after the designers got the idea that he would not cut off the bricks to fill the ground so that you devastated the original measures designed to waterproof tiles tiles of course, this is the early you can find, but not out live in your home is a few decades we need to ensure the long-term design, so you must pay attention to the bricks in the pavement without creature destroyed
19 when the composition is now bought ready-made cabinets are the most directly is because the family The water issues need to be near to build the design, of course designers in addition to circuit design but also accuse the designers set their own homes who are often under the kitchen cabinets so the scale to better determine your cooking at home more snug to use sheet metal cabinet recommended to choose such a large load to bear safe



tile sealant and not the same as the use of white cement, but the masons routinely use the method fill fill white cement tile sealant, so that Time to go on sealant, sealant pointing to a little bit better and not dry the paste to the wall. Also, cabinet hinges, the pool water, switch and so use the good, the cabinet material, pool cell body, pins can be used in general, of course, if you will not care about the money.
large package if it were not for, I suggest to buy building materials to the east as far as possible to their homes, actually the home, B & Q to buy such a place can be returned.
131, at the entrance to the light switch, we recommend using inductive type. Black day home, save the dark.


132, note 1 foundation construction, water, electricity transformation
(a) before entering the construction crews on the water to minute test, before they are allowed to change management.) and can beat down the plaster layer, load-bearing walls for installation on the
(c) in the buried line of control If the original line to be changed, and can not use
(d) circumference to be buried in the dark wall of the best
(e) strong electric
(f)



133, waterproof
(a) kitchen, health,
(b) 30 cm away from the wall to do it twice, more than 30 cm can do it again, wrap need the waterproof door pocket door.
(c) waterproof finish to be dry, the Redo waterproof layer. Most likely the leak is the


134, tile
(a) the owners is essential in the selection of tile for tile quality finds its way: first, to see its color is uniform, non-mottled black specks and small holes the line; followed depends on whether the standards of its size, the amount of tiles with a tape measure the width and width, measure out the size of the factory size to be consistent with its trademark, the diagonal and then the amount of the tile, such as the crooked line, then the tiles is assured; then look at the flatness of the tiles, the most simple and efficacious usage is to tile the same mark of two overlapping positive and negate, such as overlap significantly after the gap between two chips of tile or you can rotate the tiles irregular; last look There is no color tiles, the method is to take out a few samples of the same type of tile, in the light are compared, such as do not see the color inconsistency can be ordered.
(b) After the tiles stick can not have a whole piece of brick hollowing (regional hollowing whole piece of brick can not surpass 20 percent sign), if the needs of the all film Brick hollowing rework normal circumstances, Post 100 per brick, brick wall tiles are allowed to have a hollowing, brick tiles are allowed to have two hollowing, but must rework, rework the main material (yet counted in the wastage within) from them, such as Over this range, the main material responsible for the construction.
(c) Under normal circumstances, the level of tile degree of misdeed tolerance of 2 mm, the gap to be persistent with tiles, bricks and tiles should be smooth on the corner (allowed error of 0.5 mm),GHD Green Butterfly 2011, kitchen, health and brick wall in addition brick and tiles should be smooth on the corner, the need to level degree (error to allow 1 mm) and perpendicular (allowing 2 mm error) to achieve, bathroom, balcony tile floor drain should be considered, you must first put away slope, if there is no special causes may not have water.
(d) in the wall and floor tile Puwan required after the


135, anti-termite
(a) punt down the walls and the trough in the garbage after, a comprehensive anti-termite (termites sprayed the whole house that drugs)
(b ) After the portal of all plates in need of anti-termite treatment (specifically made for wood termite category)
(c) required before wood floor shop to shop on the ground to do a wood floor termite
(d) termites spray to wet the narcotic is preferred (you can clearly see the wet)


136, the computer is also a research greenbacks, and now the calculator has multiple functions to set the decimal point, making operations will have different standards when, so we need to send a calculator yourself, and now mobile phones have computing capabilities, but the functionality is not good.


137, two better prepare themselves independent glass, plastic (1 clear, 1 white), recommends to the General Electric Company, B & Q for marketing, 49 a. Pretending to bath room, sink, cabinets, security doors when they need it. While the general factory installed package will come with glass, plastic, glass plastic, but most of them meager quality, easy to change color or mold the future.


138, if only a last resort, do not use toilet seat shifter. This stuff is very presumable to cause clogging toilet bowl water.


139, Lvkou Ban kitchen, two on the hood, open the holes we have to wait a good hood completely up security after installed. An early and I go home, and later removed to setup hood Shiyou, apart and put them all out of fashion along workers, seamless ceiling has transform a ceiling joints.


140, if the intention of uniform appearance, is also fitted kitchen and bathroom doors, and that soon after the installation on the door apparent with the ground glass joints where glue. I do not have time for processing, water workers are not detailed, a lot of water splashed on the ground infiltration to the door frame, the following part of it has been a little black (mold) of the.


141, must be tiled balcony! King balcony to angle around to shop, shop to life and railings to the balcony the same height. My view balcony to balcony wall angle and the life there is no shop, had ready a tub of wall paint, refresh yourself on a normal foundation ... ...


142, sealed in the wall of water reform must allow the decoration to invest detailed master water map.


143, if prepared to paint the wall color in the electronic transformation of the time necessary to take into account the problem of alley changing. Changed a lot of my family line, air-conditioning outlet bit all changed. But in order to save money, not for the entire line, but the wiring. This wiring must be installed where the whiteboard for future upkeep. Later, brushing the wall paint color, etc. only to find how these white glare, regret ah ~~~~~


144, which is the lowest level I made a fault, I presumed that the mattress 1.5 m breadth is 1.5 meters, forget the thickness of the mattress there. Very accurately in bedside cabinet to linger well back the bulb socket on the wall. As a result, there is no path to block the outlet accustomed to be.


145, started before the skipper to make the decoration of the wall how to deal with the need to shovel out all the original powder. In particular, ready to paint the wall works outsourced to the company's students. My family is contracted out to paint companies, such as woodworking look after painting the walls gray only know thatit is bad, it is best to shovel out the whole re-Pihui. However, wood has been done, to spade out the ash is not good the original operation. Finally had to brush the surface of a layer of glue Pihui 108.


146, addition the line must be re-wiring. But the terminus from the nearest branch wiring. The amplify is not allowed in the original wire connector wiring.


147, air-conditioning control switch only in the power supply side. Added on the line is not allowed.


148, change the location of tel and network cable, while the original cloth of the line can be drawn to persist to use. However, if the unsuitable construction there will be many hidden perils. So the best room of the weak from the carton to be replaced.


149, dimension circuit transformation workload is generally in consensus with the wiring in three assorted ways were measured.
(1) play slot pipe (at trough length measurement, if a tank with multiple basis canals, calculated according to half the number of tubes. The other half included in the on the head of lines.)
(2) overhead line (wearing tube not play slots), calculated according to the length of pipe.
(3) for cable, according to the number even now the number of replaced (replaced the line to acquaint the construction team do not dart).
(4) weak reform, according to the first method. The difference is who should pay attention to the weak line is purchased. Owners will have less to buy wire prices.


150, how the toilet firm to the floor, hit the screw with it? There is convergence at the base and pipeline, to buy what were sealed and the outside is better: the toilet was fixed with expansion screws. Convergence at the base and the inside of the pipe with a special sealant toilet. Out of white plastic with the deployment of white cement + water slurry. When the toilet is generally purchased with a special sealant.



151, buy materials, we must first calculate your approach usage. To buy water when the material to do anyway, after meditative about a painting materials by sea chart in the end how many came out, so little believe in a little while the foreman, the result was that buy the water 5 meters, the actual use 27 copper head months, actually bought a 40, should the remaining 13, seven short of the actual remaining 6. Under repeated answering of the foreman back from the other site Details of their pre-calculated circuit material, the calculated results and after comparing the foreman of the requirements: from 30 m to 12 cable meters, network cable from 20 meters to 13 meters, other such as insulating tape, plug had great way was I correct ... ...


152, if there are old water pipes below the ground, in adding to switch hit, it tends to be damaged, do not hesitate to be the laying of fashionable, do not save, to ensure safety .


153, bathroom walls that retraction of the mitten do not waste space, and posted a very good very good tile. Of course, that tile alliance trouble saying


154, do not use tile received positive side of the line angle to 45 degrees splicing bricklayer before grinding pretty, of course, you do not choose Tijuana workers lazy way to do things.


155, aluminum pipe, when installed must be sealed cement workers in the supervision of the construction standards in accordance to the hot water pipe Reserve space for expansion. Short plastic tube not closed strong, and lax some of good thing.


156, the bathroom floor if higher than the lobby, the transition can be used to solve the door stone.


157, and move the sewer pipe mouth, then the new and old sewer pipes should be checked before the entrance of the old sewer butt is smooth, this time a lot of money to clear the bit to avoid future trouble.


158, Lvkou Ban did not need to buy high-price, very cheap Lvkou Ban has been far better than the effect of PVC, the more money I can not see the effect of significantly different .


159, buy Lvkou Ban particular attention to the keel and not Lvkou Ban itself (Lvkou Ban goal is not easy to tamper too much), the keel often complete ghost.


160, the color of brick is hard to find satisfactory, and I did not find, although, not satisfied with the color of the two sub-cross mosaic is a 45-degree angle to attain the results I am very satisfied. This is indeed the bricklayer himself put ahead good suggestions.



161, under the supervision of the ground water hateful to use is not in accordance with the requirements of my bricklayer but directly poured on the ground, it can even do! It is not the best yourself, do not disturb but guaranteed.


162, the slope of the bathroom floor before tiling to consider the good, the slope is not in accordance with citizen standard to achieve the effect of rapid drainage, and if you use a deodorant or a svelte floor drain floor drain will be greatly increased drainage problems. Some people say that steep slope and pretty, I think it is ridiculousness. Instead larger slope can speedily run a clean water is very agreeable thing.


163, the LG door with platinum point fire board, the effect is good, but might consider if we made the decoration finished door. The door by hand is not refined, for reference only.


164, sink big market brand-name price is not cheap, brand-name quality lunatic bad.


165, the balcony door is best to use the same type of bombard board. Balcony environment is harsher.


166, bathroom vanities and cabinets to do when they have to consider the size of basin avoid good fit in the future.


167, the glass is massive stuff, the best buy in the neighborhood, or first think of a good means of transport.


168, install the lock bolt head should pay attention to some wax, crashing to a December to late. If you do not smoke, then the door handle must be taken to avoid damage to wall.


169, matte paint is high and light is beautiful, do not listen to the painter, and if only brushed matte painter, said that its technology must be bad. Similarly, if a good painter, said polyester polyurethane is not lying to you


170, insulating tape and Teflon tape in the store to buy another large supermarket was much better quality, and full heaviness, conversion down the price is not expensive.



171, if the re-decoration will be used instead of talc putty finished, no big reason is that finished product easy to use putty. Especially after the painter fired when their own experience diy - talc tone putty sick of it.


172, installation and wind leakage protection switch junction box of the project can not be provincial, but not on the outside to be on the interior, the original compensation will want to save the old junction box outside the use, electrician recommended a new one on the interior, and now thathe suggested this valuable. On the interior door is not bad, it really easy to use!


173, large decorating company directly to the workmen on site clearance work may be more appropriate package, and better technology, tools, more


174, and air leakage protection switch to use the best brands. I used the Want to buy the real thing is simple, straight call MGE inquiry headquarters call number and called to ask the local branch number.


175, the audience delicate pots pots than on stage, good-looking, good cleaning.


176, basin faucet with the audience to pay attention, taking into account the basin edge thickness, leading to the mouth longer.


177, the hole in front of the toilet installation is a big, large floor drain cover can fall off, if you have installed the toilet floor drain is not installed, do pay attention to floor drain cover, or the floor drain Ye Hao stopper kept it up somewhere.


178, buy silicone, then the perfect best all imports of GE, GE followed by Shanghai packaging. Of course, if very important place in the 7,8 unit that can also be used, such as aluminum window frames with internal Jiu-level waste to plug the whole silica gel. However, all use the bathroom GE silicone kitchen, worth for money!


179, triangular valves should not be disregarded, and save much money, if the words of the triangle valve, triangle valve to be installed in advance of bronze joints are not dripping, if only installed, then only the last bronze fittings installed on the faucet to take over the child when it was installed to retard whether the interior leakage, the total leakage to pressure some time to test it, and install internal and fewer secure if the lead.


180, even in the journal has been renewed to be done about those things, their own can do it, do not, but also with the idea, please decoration companies to communicate more with the designer, please construction team to communicate more with the workers, because the comprehension of your ideas, to depend on them.




181, fitting the biggest problem is communication!


182, little place, kitchen cabinet door type designed, BH. L-type should be designed.


183, common decoration, decoration companies, excluding the prim treatment fees, tariffs, fares accounted for 75-80 percentage sign materials, wages account for 20-25 percent sign.


184, go in the kitchen on the ground outside the pipe, that is, from home improvement to a time bombard, who say where Shashi Hou himself in trouble.


185, if the separate tube wear, but in a tank of excellent? Effects can persevere


186, inquire what the cafeteria and alive apartment are separated between the maximum cost-effective package Door, side only Pack of 6 cm, or polluted with pearly, height 2 m was not large High crude.


187, lusty and weak power migrate to each tube, to separate the best way to get away from for 10 centimeters or more, but it can be difficult, because most families in order to save costs and to open a slot. Weak audio line can perceive the same pipe.


188, inside furniture, paint and paste board can do a good job and opened the door and airing doors and windows at home, only to no pungent savour. In fact, you are using a good wood essence embark, do not deal with furniture inside.


189, the cabinet can be 15 cm plates and wood core board, the back of the five available folders, Wuli. Package doors and Tizi use nine per cent. Different materials with different techniques.


190, PPR pipe not only for cold water pipes, but also for hot water pipes, and even clean drinking water pipeline. PPR pipe interface with hot-melt technology, are completely integrated into the tubes together, so once installed suppression test, no leakage. PPR pipe and will not scale. PPR pipe scale never known, never rust, never leakage, green high water material.


191, paint board is good, the advantages of both wood and composite.


192, do not print for a long time on the wet false stone, unless you want to dry a typography surface; they should not be long-term wet cutting board on the table. Wet wood is sometimes discolor; rub the stain with a steel pellet, like hand squeeze pimples.


193, can use an ordinary gas meter in the cabinet door closed it? Need to use the shutter-type door it? Check regularly open air on the line.


194, clear contracting the tx Please note, we must validate the renovation team give you a list of materials. Their estimates may be me, I too believe that they, and the results of wires and line to buy is almost doubled.


195, the size of decisive intended sanitary ware, the best limn in advance, think the size.


196, students pay attention to the door to buy productions, if you want to chase results aid the panel with the affair package Door, then you may must be Henzai sword it!


197, Re: installation of water pipes are put before the leader and basin, sink have bought?
not, just make sure where is the basin faucet, bathtub faucet, washing machine what's on the line leading, leading 99 percent sign and fell into the water are in line with multinational norms, as long as workers are not reckless, all right. If you own basin cabinet, basin bought in advance, or optimistic about the size. In front of the sink to determine the amount of good size units, installed in front of buy Haojiu Hang Taiwan, do not forget that the audience or on stage. Distance between hot and cold water pipes with cement tiles must be accurate before the closure of 15 cm, and must be parallel. If you have bought, it is best put something, such as sealed after the unload.


198, if an 8-core cable in the meantime take the phone and network, will not interfere with each other it? Not. 1,GHD Green Straighteners,2,3,6 hit cable module, 4,5 hit the phone module, and the other two easily. My experience was right: 10M by 1236 100M in fact used to have the speed to 10/100M that we will not feel any different. If a 8pin line, then the marker will cause some program-controlled switches on the network marking interference in the home environment generally will not have any problem. But rest assured that I can recommend such a route will leave apart to the margin, the network cable is very cheap that you say?


199, be sure to check the delivery box installed properly.


200, fitted bath and shower faucet lessons joined to the faucet pipe is embedded in the wall, and I repeatedly told them to size to get accurate, not to pretend not in due time. The results left a hot and chilly water is 15 cm spacing, can be hot and cold water pipes are not parallel, the result took a plumber just put on the coerce feeding. Yesterday discovered that my fb leading high-temperature coating device actually does get cracked. If we can first load leading to the first installed it. Leader should be bought first, then install hot and cold water pipes, tiling it. Oujia bought early leader, is Oujia master to buy.
  Reply With Quote

Sponsored Links
Old 06-05-2011, 05:43 AM   #2
hijk530
 
Posts: n/a
Angry a retabilization

a re-stabilization wow gold to run out not delay wow account to guess again. but this decelerate cheap wow gold was too unpunctual. nearest a wow powerleveling containerful of hopeless hair wow accounts suddenly blinks immature crazy .
  Reply With Quote
Reply


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 02:09 PM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum