Quick Search


Tibetan singing bowl music,sound healing, remove negative energy.

528hz solfreggio music -  Attract Wealth and Abundance, Manifest Money and Increase Luck



 
Your forum announcement here!

  Free Advertising Forums | Free Advertising Board | Post Free Ads Forum | Free Advertising Forums Directory | Best Free Advertising Methods | Advertising Forums > Other Methods of FREE Advertising > Safelist Directory

Safelist Directory Safelists will also work if you use them. The bigger the list the better isn't always true... sometimes the smaller lists can be just as responsive if not more. It all depends on you and your dillegence.

 
 
Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
Old 05-03-2011, 03:34 AM   #1
af9kqm9xcsl
 
Posts: n/a
Default Construction prestashop Environmental Engineeripre

Construction prestashop Environmental Engineering, Accounting

(a) fill in the blank:

1. environmental protection equipment which of two categories: (1) constituted by equipment category: single equipment; complete sets of equipment; production lines. (2) divided by the nature of equipment: machinery and equipment; structures; instruments and equipment.

2. leveling means which four areas: roads, and water and electric power supplies, flat ground.

3. artificial filling points which three categories: plain fill, mixed fill, hydraulic fill.

4. construction item which two phases: preparation before the start of construction, pre-construction phase of the construction preparation.

5. Safety Management have that three: labor protection management, security, technology and engineering, labor health technology and engineering.

6. based on which of two types of Rubble: strip foundation under the wall, independent foundation under column.

7. What are the three materials chimney construction: masonry chimneys, reinforced concrete chimney, steel chimney.

8. reinprestashopced and which of the mechanical properties: the yield point, tensile strength, elongation and bending properties.

9. What are the foundation approach are two: soil replacement cushion method, dynamic compaction method

10. formwork system which of two parts: the template, support

11. concrete pour requirements of the four degree of stone: the thickness, depth, density, level.

12. waterproofing the four principles: Anti-row combination of hard and soft and use, multi-channel maximum security, comprehensive management

13. which projects generally include several components: project, feasibility study, land acquisition, survey, design, construction, completion and acceptance and delivery

14. What are two indicators of investment estimate: Estimating comprehensive investment projects, investment in construction projects estimated single index

15. settlement, including which of two parts: prestashop completion of settlement construction enterprises; the completion of settlement construction unit

16. of compaction quality factors: moisture content of soil prestashop laying soil thickness, prestashop number of compaction times

17. reinprestashopced the cold: cold drawn prestashop cold drawn included.



(b) Definition:

1) What is the construction period control? Quality control?

Answer: the so-called control of construction project duration is the entire process of construction for the project, through planning, organizing and scheduling and other means to mobilize all positive factors to achieve during the construction phase of the duration of the target.

environmental engineering construction quality control is in the construction phase and quality control through quality tests, do not meet the quality standards of process and the factors that affect product quality improvement measures taken to adjust the management process.

2) The concept of project construction preparation: is the proposed goal of the project, resources, supply and construction scheme of the selection and arrangement of space and time for sorting and other aspects of the construction decision-making.

3) concrete: is the use of lime powder (or lime powder), clay and sand as raw material, by volume ratio of 1:2:3 ratio of water from mixing evenly, mainly for building based on the road or the ground cushion.

silt: particles size greater than 0.075 mass does not exceed 50% of the total mass, and shape index equal to or less than 10 of the soil.

assessment material: the amount of construction materials, the size of the estimate

4) the construction process of the law of vibration, vibration method, rolling method?

A: The use of vibration and the flush method is called reinforced soil vibroflotation.

vibration method is to hammer on the soil of the interior, by means of vibration equipment to vibration, the relative displacement of soil particles that occurs close to the state.

rolling method: is rolling along the surface of the drum or wheel cylinder pressure of compacted soil

5) two flat side (brick used), three along the small brick of a law

A: The two flat side of a brick wall for two consecutive Pippin with a brick skin up and down along its side of the interval of puzzle blocks.

three Junichi D brick wall method is a skin used in all three consecutive tiles with a smooth skin of brick used in all the small block partitions.

6) vertical transportation facilities: refers to the responsible delivery of materials and construction workers vertical up and down the machinery and equipment and facilities.

7) beam clamp: also known as the beam bracket, for fixed rectangular beam, beam and so the template side of the template, you can save bracing materials can also be used on the port side of the card holder template.

8) arc welding: arc welding machine is used to virtuemart template between the electrode and high-temperature electric arc welding parts, the welding and electric arc welding pieces of burning within the melt, wait until the solidification, the weld is formed by the joints.

9) Thermal Correction: The correct parts out in order to increase the heating temperature of steel, plastic, reduce stiffness, use of force or deformation of the cooling contraction of the correction process.

10) investment estimates, project billing, project tendering environment, environmental engineering tender?

A: The investment estimate is the construction unit in the project investment decision-making process,virtuemart template, according to the provisions of existing data and the estimation methods on a construction project to estimate the amount of the investment documents.

project settlement refers to the period of construction and installation works, construction units and construction units around the construction and installation, price calculation, payment matters Bafu and economic exchanges took place behavior.

Environmental Engineering tenders: means a contract in accordance with the statutory tender process for the proposed project is funded by their own or entrust a consulting company (or Management Company) the preparation of tender documents, invitation to tender by public tender or competitive way, merit-based determine the general term for a series of work the contractor.

Environmental Engineering units Tender Tender Tender is the whole process, including engineering design and construction tender bid.



simple question

1. What organizations, including the construction, characteristics?

A: including different professional workers to organize and numerous types of machinery and equipment in an orderly manner into the construction, to organize a wide range, dozens or even hundreds of tons of building materials, products and structure parts of the production, transportation, storage and supply, organizing the supply of construction equipment, repair and maintenance work, temporary construction site organization of water supply, electricity, heating, and arranging the construction site of production and living needs of a variety of temporary buildings work. Construction organization has the following characteristics: 1, the construction project on the products in the space fixed 2, 3 construction project diversity of products, mobility products, construction project 4,prestashop, the construction project of five single product, periodic production of construction projects 6, open-air production of construction project operations and aerial multi 7, the construction project in collaboration integrated production complex.

2. earthwork construction features?

A: 1, factors are many and complex construction conditions 2, towers, and 3 heavy labor, high quality requirements, and closely related to the construction process.

3. ground treatment methods are there?

A: The foundation approach are: 1, 2, soil replacement cushion method, dynamic compaction method 3, 4, compaction pile method, preloading method 5, 6 vibroflotation, chemical reinforcement method

4. piling, including what aspects of quality control?

A: Quality control of piling three major areas: 1, pile vertical plane position and the deviation should be within the allowable range. Plane with the average position error limit of 1 / 3 to 1 in diameter or side length, the vertical deviation should be controlled within 1%. 2, should meet the requirements of the final penetration 3, the buried depth of the pile tip elevation should meet the design

5. Template installation requirements?

A: Template installation requirements are: 1, well construction preparation work, and carefully review the template center line of the shells, the skin edge elevation position. 2, the templates installation location, section size, elevation, embedded parts, and set aside hole location, to meet the design requirements. 3, the pattern is to be installed firmly, so that smooth vertical and horizontal, support stable, good condition. 4, to facilitate removal of the template, the template should be brushing the inside of release agent. 5, in close coordination with the relevant trades.

6. the quality of concrete ways to deal with what?

A: Treatment of Defects in Concrete include: 1, wipe the surface of pulp repair 2, 3 fine aggregate concrete to fill, cement grouting and chemical grouting.

7. What are the design principles of budget estimates?

A: 1, strict implementation of national development policies and economic policies. 2, to completely and accurately reflect the design content. 3, in conjunction with the actual proposed projects, reflecting the location of the project was the principle of the price level. 4, catch the principal contradiction, focused, to ensure the quality of budget preparation.

8. pipe connection options?

A: (1) screwed (2) Flange connections (3) welded connection (4) socket connection (5) The bonding connection (6) Expansion Joints (7) card set of connections

9. the construction of off-site preparation include? Compaction methods include?

A: The construction of the off-site preparation, including 1, 2, materials processing and order, good sub-subcontract work and 3, to start the application report submitted to the competent authorities

compaction methods include 1, 2, rolling hair, compaction method 3, vibration method

10. scaffolding requirements: (1) reasonable structure, easy to take the demolition, working with many times. (2) strong, stable, during the construction period to meet a variety of load and weather conditions in normal use. (3) local conditions, local materials (4) the width should be satisfied with manual operation, materials stacking and transportation needs; scaffold width is generally 1.5 ~ 2m

11. vertical transportation facilities? 1, Tic-Tac-frame gantry; 2, construction elevator.

12. earthwork excavation is divided into many categories, the number of class?

A: site preparation, construction of shallow foundations, large-scale underground excavation, earth filling.

by the ease of soil excavation, the soil is divided into soft soil, ordinary soil, firm soil, gravel firm soil, soft rock, plays hard rock, hard rock, hard rock special class of 16 8. (10 Class 16) (1) cross-cut method: Cut the horizontal plane to the width and depth to move gradually from one end or both ends is called cross-cut excavation method, this law applies to short and deep cutting . (2) longitudinal cut method: Cut along the full width to the depth of excavation is not forward of the vertical stratification as layered vertical digging method. This law applies to a long road cutting. (3) When the lines are large vertical length and deepened when the excavation method should be adopted hybrid, cross-cut method and the channel is about vertical digging method mix. Dig channels along the vertical cut first, and then along the horizontal slope mining, excavation slope to increase.

13. rustle stirred slurry process, if a large number of water when mortar how to do?

A: The mortar appeared the phenomenon of bleeding, before laying back in prestashop mix should be uniprestashopm.



1. group of commonly used types of sand mortar puzzle? A: Saudi Arabia

2. block group adopted the process of wiping slurry mortar joint method (squeeze pulp or pulp scraping?) A: squeeze slurry

3. slit wiping slurry with what? Slurry scraping

4. chimney What are the basic component parts? Multi-flue chimney to use under what circumstances?

A: The chimney is usually based on cylinder blocks, Tong Shen, barrel first, and some corresponding auxiliary facilities and so on. Only in exceptional circumstances (not in direct contact with the sulfur smoke)

5. heat transfer performance of concrete?

A: The concrete is a poor conductor of heat, fire can damage the surface, and not easily damaged its interior.

6. of stone structures on the storage capacity (storage tank under what circumstances the use of stone building? capacity unsafe?)

A: The smaller capacity of the storage tank for the collection, such as wells, septic tanks

7. template removal procedures?

A: Generally after the demolition is the first branch, posterior branch of the first demolition; first demolition of non load-bearing part of the load-bearing area after the demolition. Ribbed floor before demolition column template, and then split floor film, beam side of the template, the end of the last of the Demolition template. Removal of the larger long span beam pillars should start inter-start, were removed from both sides. Celi mold removal by first-down principles. Instrumental support templates, paragraph by paragraph and block his way out of the end of die wood, and finally remove the trusses, columns, entrusted with.

8. cement mixing process of three thousand three wet?

A: the first in the dry mix of cement Jiaru Sha twice, then add stone turning, while slowly adding water, mix the wet side of at least three times repeated.

9. the purpose of bidding, content and what the settlement in the case of fixed and easy to change / not change?

A: The implementation of the bidding system is intended to meet the needs of the market economy, promote the construction units and construction units in the building for fair trade, fair competition, to ensure project quality, project duration and project cost control, improve investment returns.

content: environmental engineering, including engineering design tendering and bidding for construction bids; tender tender tender units is the whole process, including engineering design and construction tender bid.

fixed settlement change: the project by way of bidding, the settlement price of the tender shall be carried out in principle. But some longer duration, content, more complex projects, the construction process will inevitably occur in some larger design changes and material price adjustment. If the contract provides for price adjustment provisions to allow the construction completion of the project units in the settlement, on the basis of the bid price adjustment. The scope of the contract price adjustment provisions to allow non-construction enterprises outside causes beyond the bid price the cost of construction enterprises can tender units to the proposed supplemental contract negotiations or the basis for billing adjustments.

10. pipeline corrosion of the main reasons?

A: The media was mainly due to corrosion of acid, alkali and salt corrosion of pipelines

11. prestashop main protection mechanism of cathodic protection?

A: rely on the Elimination of the anode tube, so that the resulting current hit enough to overcome and counteract the corrosion current, ie corrosion current is equal to zero, that is, the corrosion current is equal to zero, in order to stop metal corrosion.

12. compaction pile method of concept?

A: It is the first by shock or vibration to the tip of the soil into a pile pipe into the hole closed, the loose soil compaction pile pipe, pull out the column tube to fill holes in the earth or other material and tamping layer formed pile.

13. Emergency Protection Act is the main mechanism of what?

14. steel cold-drawn dual-control is what? A: control and control of cold-drawing cold-drawn stress rate

15. on the ground treatment design, in general, what kind of method is better?

A: Earth Cushioning, compaction, compaction piles, preloading method, vibro-, chemical reinforcement method, the natural foundation

16. anchor bolts installed what tools, what tools to correct?

A: wire, wire fall, steel ruler, steel ruler, hammer, wire, compass. Correction: adjust the frame and bolts to find the center line of direct instrument, book 250 Table 10-8

17. brick masonry method body?

18. bricklayer body block group commonly used forms: a cis-Ding; three Junichi D; Plum D; two flat side; Transit puzzle method; full D puzzle method.
  Reply With Quote
 


Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off


All times are GMT. The time now is 01:01 AM.

 

Powered by vBulletin Version 3.6.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Free Advertising Forums | Free Advertising Message Boards | Post Free Ads Forum